Search Result

1 - 10 (11)
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012 / Allplan 2011  | Last modified: 05.10.2020
19 user(s) found this FAQ helpful

Question:

I just installed an upgrade. How can I convert all the projects at once?



Answer:

Back up all the projects beforehand!

Do the following:

  • Exit Allplan on all workstations.
  • Only when working with Workgroup Manager:
    Log in as the Allplan administrator (sysadm).
  • Start the Services application.
  • Only when working with Workgroup Manager:
    Make sure all the computers where projects are located are up and running.
    To check this, select:
    Services application -> Workgroup Manager -> Information -> Display Project List(the second column displays the computer where the project is located).
  • Go to the computer where you want to convert the data and set the drawing file size to the maximum value:
    Services application->Service ->Hotline Tools->docsize ->512 (or 1024, if available) ->OK
    Note:
    After data conversion, you can set the drawing file size back to the initial value.
  • Start converting the data (use the computer where you have changed the drawing file size):
    Services application ->Service ->Hotline Tools -> datwaprjs: convert data of all projects
    If you reply "Yes" at the following two prompts, the program will convert the data of all projects.



Notes:

The time it takes to convert the data depends on various factors:

  • Number of projects
  • Size of each project
  • Performance of the computer converting the data
  • Network performance


It is possible to start data conversion from several workstations at the same time.

Download PDF  FAQ_EN_Converting_all_Allplan_projects_in_a_single_o...
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 01.10.2020 10:44
2 user(s) found this FAQ helpful

Question:

How can I import data from an earlier version?



Answer:

You can import data from the last three Allplan versions.
Consequently, the following import operations are possible:

Target version <- import possible from version

2017 <- 2014
2016 <- 2013
2015 <- 2012
2014 <- 2011
2013 <- 2009
2012 <- 2008
2011 <- 2006
2009 <- 2005
2008 <- 2004
2006 <- 2003
2005 <- 17
2004 <- 16

We cannot guarantee that data created in older versions can be imported and edited. The conversion of older data may be incomplete, which may affect intelligent components in particular.


1. Archived data from an earlier version (not older than three previous versions):

There are two ways to convert the data to the current version:

  • Import the project backups created and archived using the
    Services application -> Data Backup -> Import -> Projects.
    After importing the projects, convert them by opening each project once.
  • Import the backups archived using the
    Services application -> File -> Restore documents of any version to &apos;...\Extern&apos;.
    The data are written to the external path.
    You can now process the converted data in ProjectPilot.



2. Archived data from an older Allplan version (older than three previous versions):

  • See whether you can use the approach described in step 1 to import the old projects.
  • If available, it is a good idea to install an old Allplan version. Import the backups created and archived into this old version and convert the projects using the Services application. If you have imported a complete project backup, convert the data by opening each project once. When finished, repeat this process with a newer version (up to three versions later) until the data are up-to-date.
  • If an old Allplan version is not available, you can also have the data converted by Allplan. Please note that this service is not free of charge. Please contact Technical Support -> support.de@allplan.com.




Notes:

  • You can convert the data of all projects at once. Read the following FAQ in Allplan Connect: https://connect.allplan.com/en/faqid/20090408124904.html
  • If enough hard disk space is available, you are advised to keep and maintain the projects so that Allplan automatically converts them to the current version whenever you upgrade.
  • If there are project-specific smart symbol catalogs, you should open the smart symbol catalog once to convert the data.
Download PDF  FAQ_EN_Transferring_data_from_old_Allplan_versions_....
Version:  Allplan 2019  | Last modified: 12.11.2018
Not voted yet. Be the first to vote this FAQ as helpful!

Information:

This document provides further information on installing Allplan 2019.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2019.


How to install


You can find detailed instructions on how to install Allplan 2019 in the following places:

- After you have downloaded and unzipped Allplan 2019, you can find the ‘install.chm’ file in the following folder: C:\Users\Public\Documents\Allplan 2019\HelpFiles\English.

- Use the following link:
https://webdrive.allplan.com/s/4LrjrymoxESzC6p and open the General\Installation help\2019 folder.


Please read these instructions before you install Allplan 2019.

System requirements for Allplan 2019

https://connect.allplan.com/en/faqid/20180608093815.html

How to handle licenses when upgrading to Allplan 2019

https://connect.allplan.com/en/faqid/20180608092654.html



Some notes on installing Allplan 2019

If you want to switch from Allplan 2016/2017/2018 to Allplan 2019, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2016/2017/2018.

1. First-time installation

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). Setup does not transfer any data or settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2019 and then upgrade from Allplan 2016/2017/2018.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from version

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). You can configure Setup to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2016/2017/2018 to the new installations folder.
This duplicates the data: You can use all projects, defaults and resources both in Allplan 2018 and in Allplan 2016/2017/2016. This way, you can test the new version without losing your 'old' Allplan version.
Bear in mind, though, that you should not mix data from different versions. Merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already used the second installation option to install <Product_Version> to a computer that accesses the same data server. As a result, the data are already available.

3. Upgrade and transfer data from Allplan 2016/2017/2018

This option installs Allplan 2019 to an existing folder, converting Allplan 2016/2017/2018 to Allplan 2019 and transferring all important settings. Afterwards, you can no longer work with Allplan 2016/2017/2018.
This does nor affect earlier Allplan versions (Allplan 2015 or earlier).


Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2019. Beforeyou start installing, make sure that all workstations can be upgraded. For technical reasons, it is not possible to mix installations of different major releases. Any related problems area not covered by service contracts.
  • During the upgrade, Allplan 2016/2017/2018 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.





Converting the data:

Data from earlier Allplan versions need to be converted to version 2019. Allplan 2019 automatically converts the data of a project you open. Click here for instructions on how to convert all projects in a single operation:

https://connect.allplan.com/en/faqid/20090408124904.html


IBD 2019

Click here for instructions on how to get your activation codes for Allplan IBD:

https://connect.allplan.com/en/faqid/20110912113530.html

Download PDF  FAQ_EN_Hotletter_2019.pdf
Version:  Allplan 2019  | Last modified: 08.05.2019
3 user(s) found this FAQ helpful

Question:

What license issues do I need to consider when upgrading from Allplan 2016/2017/2018 to Allplan 2019?


Answer:

Installation options during Setups

First-time installation with copying data (default): this option copies and converts the data of the previous version to the new version. You can choose to transfer projects, too. This option does not change the previous version.
Upgrade: this option also transfers the data to the new version. However, you can no longer use the previous version after upgrading.
First-time installation: this option installs Allplan 2019 in parallel to the version you are running. However, your data will neither be transferred nor converted. You can find more information in the help. Just press F1 during Setup.


Depending on the licensing system you use, you need to consider different points.

1. Upgrade Allplan 2019 – stand-alone workstation
The license for Allplan 2019 updates automatically. Start Setup and follow the instructions displayed. When you are prompted to choose the license configuration, select Use active license. Follow the installation instructions.
Note: The licenses only update automatically when you upgrade. To install Allplan 2019 on a new computer, please read on connect.allplan.com/license within the menu item Information on Installation and Licensing the instructions Transferring license to a new computer.
You can find your Product Key in Allplan Connect as usual. Go to: connect.allplan.com/license

2. Upgrading Allplan 2019 with a license server
Start by updating your license(s) at the license server. After this, upgrade the clients. To do this, start the License Settings program on the server. Click License Activation on the left, and then click the license you want to update. Click Update License.

After updating your license(s) you can upgrade Allplan at the clients. Start Allplan Setup and follow the instructions displayed. The license server license will be detected automatically on the network. When you are prompted to choose the license configuration, select Use active license. Follow the installation instructions.

Add-on: If your license server displays a detailed version number (build ID) directly in the lower left corner of the program License Settings, it is usually compatible with the new version and does not need to be updated. You only need to update the license(s).
If you still want to update your license server, download the software for the license server from the Allplan Connect service portal. Detailed instructions can be found at connect.allplan.com/license under the menu item Information on installation and Licensing' and the instructions 'Updating license server and licenses'.

Note: You can update the licenses only at a license server you have already installed. If you want to switch to Allplan 2019 and move the license server to a new server, please read on
connect.allplan.com/license within the menu item Information on Installation and Licensing the
instructions Moving license server to a new server.
You can find your Product Key in Allplan Connect as usual. Go to: connect.allplan.com/license


Downloading licenses from Allplan Connect

You can also obtain your activation codes for Allplan 2019 IBD in the Allplan Connect service portal.
To do this, click Profile > License Management.

You can only use this function as an administrator.


License for Allplan Allfa 2018

You will get your license by mail from customercare@allplan.com. So that we can create the license for you, please send us your IP address or the Host ID of the Allfa database server (Oracle).

Download PDF  FAQ_EN_How_to_handle_licenses_when_upgrading_to_Allp...
Version:  Allplan 2020  | Last modified: 24.10.2019
5 user(s) found this FAQ helpful

Question:

What license issues do I need to consider when upgrading from Allplan 2017/2018/2019 to Allplan 2020?


Answer:

Installation options during Setups

First-time installation with copying data (default): this option copies and converts the data of the previous version to the new version. You can choose to transfer projects, too. This option does not change the previous version.
Upgrade: this option also transfers the data to the new version. However, you can no longer use the previous version after upgrading.
First-time installation: this option installs Allplan 2020 parallel to the version you are running. However, your data will neither be transferred nor converted. You can find more information in the help. Just press F1 during Setup.


Depending on the licensing system you use, you need to consider different points.

1. Upgrade Allplan 2020 – stand-alone workstation

The license for Allplan 2020 updates automatically. Start Setup and follow the instructions displayed. When you are prompted to choose the license configuration, select Use active license. Follow the installation instructions.

Note:
The licenses only update automatically when you upgrade. To install Allplan 2020 on a new computer, please read on connect.allplan.com/license within the menu item Information on Installation and Licensing the instructions Transferring license to a new computer.
You can find your Product Key in Allplan Connect as usual. Go to: connect.allplan.com/license


2. Upgrading Allplan 2020 with a license server


Start by updating your license(s) at the license server. After this, upgrade the clients. To do this, start the License Settings program on the server. Click License Activation on the left, and then click the license you want to update. Click Update License.

After updating your license(s) you can upgrade Allplan at the clients. Start Allplan Setup and follow the instructions displayed. The license server license will be detected automatically on the network. When you are prompted to choose the license configuration, select Use active license. Follow the installation instructions.

NOTE: If your license server displays a detailed version number (build ID) directly in the lower left corner of the program License Settings, it is usually compatible with the new version and does not need to be updated. You only need to update the license(s).
If you still want to update your license server, download the software for the license server from the Allplan Connect service portal. Detailed instructions can be found at connect.allplan.com/license under the menu item Information on installation and Licensing' and the instructions 'Updating license server and licenses'.

Note: You can update the licenses only at a license server you have already installed. If you want to switch to Allplan 2020 and move the license server to a new server, please read on
connect.allplan.com/license within the menu item Information on Installation and Licensing the
instructions Moving license server to a new server.
You can find your Product Key in Allplan Connect as usual. Go to: connect.allplan.com/license


Downloading licenses from Allplan Connect

You can also obtain your activation codes for Allplan 2020 IBD in the Allplan Connect service portal.
To do this, click Profile > License Management.

You can only use this function as an administrator.


License for Allplan Allfa 2019

You will get your license by mail from customercare@allplan.com. So that we can create the license for you, please send us your IP address or the Host ID of the Allfa database server (Oracle).

Download PDF  FAQ_EN_How_to_handle_licenses_when_upgrading_to_Allp...
Version:  Allplan 2021  | Last modified: 06.10.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Information:

This document provides additional information on installing Allplan 2021.

Data backup/archiving:

We strongly recommend that you perform a complete data backup and archive this data before you upgrade to Allplan 2021!


Installation Instructions:


Detailed installation instructions can be found in the following places:

- If you have downloaded and unpacked Allplan 2021, you will find the file install.chm in the folder C:\Users\Public\Documents\Allplan 2021\HelpFiles\English


Please read these before installing Allplan 2021.

System requirements Allplan 2021

https://connect.allplan.com/de/faqid/20200930085615.html

Licenses when upgrading to Allplan 2021

https://connect.allplan.com/en/faqid/20200821110044.html


Extract from the installation instructions (see above)

If you want to switch from Allplan 2018/2019/2020 to Allplan 2021, you have three basic installation options.

1. New installation

Allplan 2021 is installed in a new folder. Any existing installations of Allplan (2020 or older) are not affected. No data and settings are transferred to the new installation.

The following options are available for transferring data later:

Uninstall Allplan 2021 and then upgrade Allplan 2018/2019/2020.
Integrating the data by hand (administrator knowledge required).

2. New installation with data copy from version

Allplan 2021 is installed in a new folder. Any existing installations of Allplan (2020 or older) are not affected. The office standard (\std), projects (\prj) and user data (\usr) can be automatically copied from an existing version 2018/2019/2020 to the new installation folder.
In this way, you can create a duplicate dataset if necessary: all projects, standards and resources can be used in both Allplan 2021 and 2018/2019/2020. This allows you to test the transition to the new version in real life, while the existing Allplan installation remains fully functional.
Note, however, that this method of working should avoid parallel processing of data in both installations, as the subsequent merging is time-consuming.

2a. Continuation of new installation with data copy from version

This option is available if a new installation with data copy has already been performed on another computer accessing the same data server and therefore the data has already been transferred.

3. Upgrade with data transfer from version 2018/2019/2020

Allplan 2021 is installed in an existing folder. The existing installation of Allplan 2018/2019/2020 is converted to Allplan 2021 and all important settings are transferred (see also Limitations for Data Transfer). Allplan 2018/2019/2020 is then no longer available.
Any existing installations older than Allplan 2018 are not affected.


Network Installations:

For network installations (shared 'central file storage folder'), only one main release version can be used - all workstations must be brought to Allplan 2021. Before starting the installation, make sure that all workstations have upgrade authorization. A mixed installation of different main versions is not technically approved. Complications that may arise are not covered by the maintenance contracts.

During the upgrade, no workstation may be running any version 2020, 2019 or 2018.

In case of an installation with Workgroupmanager all workstations must be checked in during the upgrade.




Data Conversion:

Data from older Allplan versions must be converted to version 2021. This happens automatically for projects opened in Allplan 2021. For instructions on how to convert all projects at once, click here:

https://connect.allplan.com/de/faqid/20090408124904.html

Download PDF  FAQ_EN_Hotletter_2021.pdf
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 30.09.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I make several projects available to users when Workgroup Manager is installed?



Answer:

You can make several projects available to a user or define a user as the project owner of several projects.

Do the following:

First, log in as the Allplan administrator.
If necessary, set up an Allplan user for the new Windows user: Services application -> Workgroup Manager -> Configuration -> Add a user
(Allplan 2014 and later:Services application -> Workgroup Manager ->Administer users)

Start Allplan and then ProjectPilot by clicking
File -> ProjectPilot

Open the Projects folder in the area on the left.
You can see all the projects in the Contents of "Projects" area on the right.

a. Making several projects available to users:
In the area on the right, select the projects to which you want to add users or from which you want to remove users (CTRL or SHIFT key or use a selection rectangle).

Click one of the selected projects with the mouse button. On the shortcut menu, click
Add / remove authorized users...
The Add / Remove Authorized Usersdialog box opens.

Select the users you want to add to or remove from the selected projects.
Note:
The user list displayed only helps you select users. It does not list all the authorized users currently assigned to projects.

Click Addor Remove.
This adds or removes the selected users to or from the selected projects. Whether users you have already added to a project are added again is irrelevant. The same applies if you remove users you have never added to a project.

b. Defining a project owner for several projects
In the area on the right, select the projects for which you want to define the owner (CTRL or SHIFT key).

Click one of the selected projects with the mouse button. On the shortcut menu, click
Change project owner...
The Define Owner dialog box opens.

Select the user you want to define as the owner of the selected projects.
Note: The user list displayed helps you select users. You can define only one user as the owner.

Click OK.

c. Defining a project owner for a project or making a project available to several users(also applies to earlier versions):
In ProjectPilot in the area on the right, click the relevant project with the right mouse button. On the shortcut menu, click Properties.
The Properties for <project name>dialog box opens. Switch to the Security tab and define the owner and the authorized users.



Note:

You can add or remove project users or define the project owner only if the projects in question are in the current Allplan format.

Download PDF  FAQ_EN_Making_several_projects_available_to_users.pd...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Last modified: 30.01.2020
1 user(s) found this FAQ helpful

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects&apos; resources to &apos;Project&apos;.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for &apos;Pen and line definitions&apos;, &apos;Fonts&apos;, &apos;Patterns, hatching styles, area styles&apos;, &apos;Bar and mesh cross-section catalogs&apos;, &apos;Layer structures, line styles, drawing types&apos; and &apos;Attributes proposed&apos; from &apos;Office&apos; to &apos;Project&apos;, if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the &apos;General&apos; tab and select the &apos;Same folder name as project name&apos; setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing &apos;project.dat&apos; file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Download PDF  FAQ_EN_Switching_from_single_installation_to_network...
Version:  Allplan 2021  | Last modified: 02.10.2020
1 user(s) found this FAQ helpful

Question:

What license issues do I need to consider when upgrading from Allplan 2018/2019/2020 to Allplan 2021?


Answer:

Installation options during Setups

First-time installation with copying data (default): this option copies and converts the data of the previous version to the new version. You can choose to transfer projects, too. This option does not change the previous version.
Upgrade: this option also transfers the data to the new version. However, you can no longer use the previous version after upgrading.
First-time installation: this option installs Allplan 2021 parallel to the version you are running. However, your data will neither be transferred nor converted. You can find more information in the help. Just press F1 during Setup.


Depending on the licensing system you use, you need to consider different points.

1. Upgrade Allplan 2021 – stand-alone workstation

The license for Allplan 2020 updates automatically. Start Setup and follow the instructions displayed. When you are prompted to choose the license configuration, select Use active license. Follow the installation instructions.

Note:
The licenses only update automatically when you upgrade. To install Allplan 2020 on a new computer, please read on connect.allplan.com/license within the menu item Information on Installation and Licensing the instructions Transferring license to a new computer.
You can find your Product Key in Allplan Connect as usual. Go to: connect.allplan.com/license


2. Upgrading Allplan 2021 with a license server


Start by updating your license(s) at the license server. After this, upgrade the clients. To do this, start the License Settings program on the server. Click License Activation on the left, and then click the license you want to update. Click Update License.

After updating your license(s) you can upgrade Allplan at the clients. Start Allplan Setup and follow the instructions displayed. The license server license will be detected automatically on the network. When you are prompted to choose the license configuration, select Use active license. Follow the installation instructions.


NOTE:
Check the version of your installed license server on the server. Starting with the license server version 2016-1-4, the detailed version status (Build-ID) is displayed directly in the lower left corner of the License Settings program.

The latest version 1.1196.xxx.xxx should be displayed here. If an older Build ID is displayed, then you still have an older license server in use. In any case, please update your license server. Download the software for the license server from the Allplan Connect service portal. Detailed instructions can be found at connect.allplan.com/license under the menu item Information on installation and Licensing' and the instructions 'Updating license server and licenses'.

Note: You can update the licenses only at a license server you have already installed. If you want to switch to Allplan 2021 and move the license server to a new server, please read on
connect.allplan.com/license within the menu item Information on Installation and Licensing the
instructions Moving license server to a new server.
You can find your Product Key in Allplan Connect as usual. Go to: connect.allplan.com/license


Downloading licenses from Allplan Connect

You can also obtain your activation codes for Allplan 2021 IBD in the Allplan Connect service portal.
To do this, click Profile > License Management.

You can only use this function as an administrator.


License for Allplan Allfa 2019

You will get your license by mail from customercare@allplan.com. So that we can create the license for you, please send us your IP address or the Host ID of the Allfa database server (Oracle).

Download PDF  FAQ_EN_How_to_handle_licenses_when_upgrading_to_Allp...
Version:  Allplan 2017  | Last modified: 09.10.2017
2 user(s) found this FAQ helpful

Information:

This document provides further information on installing Allplan 2017.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2017.


How to install:


You can find detailed instructions on how to install Allplan 2017 in the following places:

- After you have downloaded Allplan 2017, you can find the install.chm file in the Helpfiles\English folder.
- You can find the install.chm file on the Allplan 2017 DVD in the following folder: <DVD>:\programs\x64\Allplan\Helpfiles\English.

Please read these instructions before you install Allplan 2017.

Some notes on installing Allplan 2017

If you want to switch from Allplan 2014/2015/2016 to Allplan 2017, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2014/2015/2016.

1. First-time installation

This option installs Allplan 2017 to a new folder without affecting any other Allplan installation (2016 or earlier). Setup does transfer neither data nor settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2017 and then upgrade from Allplan 2014/2015/2016.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from Allplan 2014/2015/2016

This option installs Allplan 2017 to a new folder without affecting any other Allplan installation (2016 or earlier). You can configure the program to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2014/2015/2016 to the new installations folder.
This duplicates the data: you can use all projects, defaults and resources both in Allplan 2016 and in Allplan 2014/2015/2016. This way, you can test the new version without losing your &apos;old&apos; Allplan version.
Bear in mind, though, that you should not mix data from different versions, as merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already installed <Product_Version> and copied the data to a different computer that accesses the same data server. As a result, the data have already been transferred.

3. Upgrade and transfer data from Allplan 2014/2015/2016

This option installs Allplan 2017 to an existing folder, converting Allplan 2014/2015/2016 to Allplan 2017 and transferring all important settings. Afterwards, you can no longer work with Allplan 2014/2015/2016.
This does nor affect earlier Allplan versions (Allplan 2013 or earlier).



Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2017. Therefore, make sure you can upgrade all workstations (deadline for Serviceplus agreement: July 1, 2016) beforeyou start installing.
  • During the upgrade, Allplan 2014/2015/2016 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.



Converting data:

IBD 2017

IBD 2017 is expected to be released with the Allplan 2017-0-1 Hotfix at the end of July 2016.
https://connect.allplan.com/en/faqid/20160707142752.html


Download PDF  FAQ_EN_Hotletter_2017.pdf
1 - 10 (11)
https://connect.allplan.com/ uses cookies  -  More information

Accept