Dear Everybody!
I have a problem with the date of Allplan. If I open a reinforcement report, the date is anything other than the actual.
I need always correct it.
Why don't use the program the correct actual date (2023.09.25.)?
Could somebody help me?
Program: Allplan 2023-1-4
Thanks, Gergő.
Structural Design Engineer.