Hi,
I am wondering if there is any way to redefine the mark number in a reinforcement plan.
I have reinforced a continuous foundation, and now have 26 types of the same mark (diameter).
I want to give the schedule with the total length per diameter.
Or is there any other way to edit mark number in the typical cross sections that will be plotted?
Thank you , and sorry, i'm new here.
Dan
With respect,
ing.Dan Suciu
S.C Draft Vision S.R.L.-D.
dan.suciu (please no spam) @ (please no spam) draft-vision.ro
+40748953809
http://www.draft-vision.ro