Support Forum

How to copy fastly a lot of floors? are there any batch process?

Schlagworte:
  • 2014

Hi,

We are working in a project with several floors. We know four methods of work with a build with several floors with the same internal distribution (thirty floors, for example):

- Copy floor to floor using the tool "Copy, Move elements between documents" (dokumentübergreifend kopieren). It's a very slow method
- Copy floor to floor using the tool "Copy to" (kopieren nach) from Project Pilot (very slow method)
- Copy floor to floor using copy and paste from floor to floor (very slow method)
- Inserting Xref (slow method)

Are there any batch process to do several identical floors?

Thanks!
Xavier C.A.

Xavier Coll • Architect, Project Manager I+D, BIM Manager, BIM Auditor
EiPM • http://www.eipm.es/en/

If you want to copy whole Floors (complete Teilbilder): Use the Project Pilot !

Klaus

Hi Klaus,

The method to copy floors in "Project Pilot" is very slow, because it's only possible copy only one file to file. It's impossible to do a batch copy process: copy one floor over several files in only one step. Imagine in a building with a lot of floors, this method it's very slow.

Thanks for the answer!

Xavier Coll • Architect, Project Manager I+D, BIM Manager, BIM Auditor
EiPM • http://www.eipm.es/en/

if you use building structure you are able to copy teilbilder.
it's the easiest way to copy.

Namenlos gezeichnet in vollem Bewusstsein - ignorant, in eigen Augen vermutlich höflich, dennoch unhöflichst, unfreundlichst wer einen/viele vermutete - sich von alters erschließende Namen nennt.
[b]

if you use building structure you are able to copy teilbilder.
it's the easiest way to copy.

Hi Markus,

I'm agree with you, but this method is still slow with a building with a lot of floors (like the building of the attached image).

Curious how Allplan doesn't have any tool to do it fastly.

Thanks!
Xavier C.A.

Xavier Coll • Architect, Project Manager I+D, BIM Manager, BIM Auditor
EiPM • http://www.eipm.es/en/

Anhänge (1)

Typ: image/png
391-mal heruntergeladen
Größe: 89,03 KiB

O.K. you want to copy one floor to many floors.
I thought you wanted to copy many floors to many floors (like for a variant.

Only another Workaround with the ProjectPilot:

Copy 110 to 120
Then copy 110 to 122 AND 120 to 124 in the same step
Now you have 4 floors)
Then copy 110 to 126, 120 to 128, 122 to 130 and 124 to 132
(now you have 8 floors)
then 16 and then all

It would be easier if the floor P1 has the number 118 instead of 100 because the difference
between every floor is 2 and you could use "Analog Quelle" (analog source ?).

Another idea for Ctrl-C / Ctrl-V

Put a text like P1, P2 etc. on every floor (Teilbild) at a different Position.
Now activate all floors together.
Switch between the floors with "Teilbildstatus ändern" (Shortcut ?). So you haven't to open the Teilbildliste.

(Sorry for my bad (D)english )

But I agree with you, a batch-copy would be helpful. We also have projects with many floors.

Klaus

Nice, It's a good trick, Klaus!

Thanks a lot for the answer, and answer it in english ;-D
I know that I will have to learn german... ;-P

Best regards,
Xavier C.A.

Xavier Coll • Architect, Project Manager I+D, BIM Manager, BIM Auditor
EiPM • http://www.eipm.es/en/