We are working in a project with several floors. We know four methods of work with a build with several floors with the same internal distribution (thirty floors, for example):
- Copy floor to floor using the tool "Copy, Move elements between documents" (dokumentübergreifend kopieren). It's a very slow method
- Copy floor to floor using the tool "Copy to" (kopieren nach) from Project Pilot (very slow method)
- Copy floor to floor using copy and paste from floor to floor (very slow method)
- Inserting Xref (slow method)
Are there any batch process to do several identical floors?
Thanks!
Xavier C.A.