I noticed a problem in civil engineering module of Allplan V2013 which was not corrected in V2014. When I want to give pos numbers to the rebars in section I use the Dimension Line/Label command with "comb" option (with "Text Leader" "3 at start + 3 at end")
1st pic
But it works like "Text Leader" option "All"
2nd pic
I click the leader option many times untill I come to "3 at start + 3 at end"
1st pic
thenn it functions normal
3rd pic
or I give pos numbers to one group and it functions wrong way but by the second positioning it functions right. Nemetschek hotline can not find a solution or solve the problem. Does anyone here has the same problem or moreover a solution for it.
DI für Hoch und Tiefbau, Nemetschek Deutschland Zertifizierter Allplan Trainer für Ingenieurbau und Architecture, seit V17 Allplan Anwender.