Hi!

We have some problems with the columns and the slabs. Columns have a priority 999, and the slabs have a priority 100, but the columns doesn't cut the slabs.

Why?

Thanks a lot!
Xavi C.A.
EiPM

Xavier Coll • Architect, Project Manager I+D, BIM Manager, BIM Auditor
EiPM • http://www.eipm.es/en/

Anhänge (1)

Typ: image/jpeg
145-mal heruntergeladen
Größe: 118,24 KiB