Version:  Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 17.10.2018 14:06
2 user(s) found this FAQ helpful

Question:

How can I import data from an earlier version?



Answer:

You can import data from the last three Allplan versions.
Consequently, the following import operations are possible:

Target version <- import possible from version

2017 <- 2014
2016 <- 2013
2015 <- 2012
2014 <- 2011
2013 <- 2009
2012 <- 2008
2011 <- 2006
2009 <- 2005
2008 <- 2004
2006 <- 2003
2005 <- 17
2004 <- 16

We cannot guarantee that data created in older versions can be imported and edited. The conversion of older data may be incomplete, which may affect intelligent components in particular.


1. Archived data from an earlier version (not older than three previous versions):

There are two ways to convert the data to the current version:

  • Import the project backups created and archived using the
    Services application -> Data Backup -> Import -> Projects.
    After importing the projects, convert them by opening each project once.
  • Import the backups archived using the
    Services application -> File -> Restore documents of any version to &apos;...\Extern&apos;.
    The data are written to the external path.
    You can now process the converted data in ProjectPilot.



2. Archived data from an older Allplan version (older than three previous versions):

  • See whether you can use the approach described in step 1 to import the old projects.
  • If available, it is a good idea to install an old Allplan version. Import the backups created and archived into this old version and convert the projects using the Services application. If you have imported a complete project backup, convert the data by opening each project once. When finished, repeat this process with a newer version (up to three versions later) until the data are up-to-date.
  • If an old Allplan version is not available, you can also have the data converted by Allplan. Please note that this service is not free of charge. Please contact Technical Support -> support.de@allplan.com.




Notes:

  • You can convert the data of all projects at once. Read the following FAQ in Allplan Connect: https://connect.allplan.com/en/faqid/20090408124904.html
  • If enough hard disk space is available, you are advised to keep and maintain the projects so that Allplan automatically converts them to the current version whenever you upgrade.
  • If there are project-specific smart symbol catalogs, you should open the smart symbol catalog once to convert the data.
Download PDF  FAQ_EN_Transferring_data_from_old_Allplan_versions_....
Version:  Allplan  | Last modified: 06.06.2019
1 user(s) found this FAQ helpful

Question:

Why is Allplan running so slow?


Answer:

Check the following points:

1. Current version
Make sure you work with the current Allplan version.

  • Do the following or ask your system administrator to do this:
    Open Allplan and click the ‘?’ icon in the upper right-hand corner. Click ‘Update Allplan’.
    Select 'Find now'. If Allplan finds updates or hotfixes, download the installation packages.
  • Deactivate the virus scanner while your are installing updates or hotfixes. This might require administrator privileges. Contact your system administrator if you have problems.
  • Right-click the Allplan icon on the desktop. A shortcut menu opens.
    Select ‘Run as administrator’ and click ‘Yes’ to confirm the following message.
    As a result, Windows security settings do not block the installation.



2. System requirements:
Check the hardware and software required for your Allplan computer.

2.a)Download and run the system test.
Check the notes.
https://www.allplan.com/de/system/systemvoraussetzungen/

2.b)Check the Allplan system requirements:
https://www.allplan.com/de/system/systemvoraussetzungen/

2.c)You can find information about graphics cards at
https://connect.allplan.com/de/support/grafikkarten.html

2.d)You can find server operating systems you can use for the central file storage of Allplan at
https://connect.allplan.com/en/faqid/20140924094923.html


3. Hotline tools:
Start the Services application, open the ‘Service’ menu and select ‘Hotline Tools’. To save your settings, select the following tools.

- savestd: Saves user defaults.
- savereg: Saves CAD registry settings.

Start the Services application, open the ‘Service’ menu and select the following ‘Hotline Tools’:

- cleanup: Initializes the display.
- cleanstd: Resets CAD defaults.
- cleanreg: Resets CAD registry settings.

Check whether this has solved the problems.
If this is not so, restore the settings you just saved. To do this, start the Services application, open the ‘Service’ menu and select the following ‘Hotline Tools’:
- reststd: Restores saved user defaults.
- restreg: Restores CAD registry settings.


4. Color scheme selected in Allplan:
Start Allplan, open the ‘View’ menu, point to ‘Toolbars’ and select ‘Customize User Interface’. Open the ‘Customize’ tab and set ‘Color scheme and icon design’ to ‘Windows’.


5. Check the availability of all projects that are not online (if you use Workgroup Manager):
Start Allplan, open the ‘File’ menu and select ‘New Project, Open Project’. Deactivate ‘Check availability of all offline projects’.


6. Virus scanner
Check whether an anti-virus program is running in the background of the computer or server.
If so, reduce protection to "programs only".

Scanning "all files" can take a long time, considerably slowing down your computer when you switch between projects or exit the program.
You can exclude the Allplan installation folders from real-time scanning.When you start the Services application, you can see a list of the folders to be excluded.
You can find more information at
https://connect.allplan.com/en/faqid/20091126145752.html
Changes in the settings of the virus scanner only come into effect when you re-start the computer.


7. Aero desktop effects
Deactivate the Aero desktop effects of Windows.
To do this, open the Control Panel, select ‘Ease of Access’ and go to the ‘Make things on the screen easier to see’ area.
Select the ‘Turn off all unnecessary animations (when possible)’ option.


8. Name resolution on the network
If Allplan takes several minutes to start, name resolution on the network may not work.
To check this, do the following:
Right-click the Windows Start Button, select ‘Run’, type in ‘cmd’, click OK, type in ‘Nslookup’ and press ENTER.
Go to the line following the > character, type in the name of the Allplan data server and press ENTER.
The reply starts with the name and address of the server providing name resolution.
You can find the name and address of the Allplan data server in the second group.
If problems occur, contact your network administrator and ask him or her to configure name resolution correctly.


9. Speed of Allplan projects
Check whether some Allplan projects are slower than other Allplan projects.
Start with the empty project and check whether it is slow too.
After this, select any other Allplan project.

If it is only the current project that is slow, the problem may be caused by the data of the current project.
In this case, the data of this project must be analyzed in detail.
Contact technical support.


10. Network: checking out Allplan using Workgroup Manager
If you use Allplan with Workgroup Manager, you can check whether the problems are caused by the network. To do this, check out the workstation with the project in question and use the project on the local Allplan workstation.
You can find detailed information on checking out an Allplan workstation using Workgroup Manager in the
Services application. Open the ‘Help’ and select ‘Workgroup Manager’.

After you have checked out the workstation, Allplan no longer accesses the central file storage of the server.
If this has solved the problems, they are caused by the network. In this case, the network must be checked in detail.
Contact your network administrator and ask him or her to do this.

If the project is still slow, the problem may be caused by the data of the current project.
In this case, the data of this project must be analyzed in detail.
Contact technical support.


11. Log files and system information files
If all the points above do not solve the problems, technical support requires more system information about the computer running Allplan.

  • So, we would be grateful if you could send us a support request (Allplan Hotinfo with Allplan logging).
    To create a support request, start the Services application, open the ‘Service’ menu and select ‘Create support request (Hotinfo)’.
    Several dialog boxes open. Select ‘Technical Support Allplan’ and ‘Enquiry with Allplan logging’. Enter all the data required. Finally, click ‘Finish’.
    Another dialog box opens, prompting you to start Allplan. Click the ‘Start Allplan’ button.
    Allplan starts, logging all processes.
    Try to reproduce the problem as exactly as possible.
    Exit Allplan as soon as possible, reducing the data in the log file to a minimum.
    Then click ‘Next’ to generate the support request with the log file.
    You can find more information about Hotinfo at
    https://connect.allplan.com/en/faqid/20140528094911.html
  • To analyze the Windows system environment, we would ask you to send us the logs created by Windows Event Viewer of your computer.
    To start Windows Event Viewer, right-click the Windows Start Button, select ‘Run’ and type in ‘eventvwr.msc’.
    You can also type in ‘Event Viewer’ in the search box of Windows. This displays the link file to the Windows event logs.
    Using Event Viewer, create *.evtx files for the application log and the system log in the ‘Windows Logs’ area and for the ‘Administrative Events’ log in the ‘Custom Views’ area.


Please send us the files.

Download PDF  FAQ_EN_Allplan_is_running_slow.pdf
Version:  Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 17.10.2018
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

Does Allplan create backup files (*.bak)?
How can I use these files?



Answer:

Allplan creates backup files when you do the following:

  1. Copy, Move Elements between Documents …
    Allplan creates a backup file of the destination drawing file or layout.
  2. Deleting drawing files and layoutsin the "Open on a project-specific basis" dialog box
    If you have selected "Create backup copies of drawing files", Allplan creates a backup file of the drawing file or layout.
  3. Importing data to drawing files
    If you have selected "Create backup copies of drawing files", Allplan creates a backup file of the drawing file.


Note on points 2 and 3:

To select the "Create backup copies of drawing files" option, click
Tools -> Options -> Desktop environment -> Save/load area (until V2009 Global Options -> Miscellaneous -> Autosave, Backup)->Create backup copies of drawing files.


Restoring:

If need be, you can restore the original drawing file or layout.
Make a note of the drawing file number or layout number and determine the corresponding project folder as follows:
Services application -> Service -> Hotline Tools -> wopro

Open this folder in Windows Explorer.

Rename the corresponding drawing file "tb000001.ndw" "tb000001.ndw.old" or the corresponding layout "pb000001.000" "pb000001.000.old.", for example.
Delete the bak extension from the corresponding bak file.

Example 1:

You have inadvertently copied the wrong elements to drawing file 4711.
1st step: exit the project in Allplan.
2nd step: delete file tb004711.ndw or rename it tb004711.ndw.old.
3rd step: find file tb004711.ndw.bak and rename it tb004711.ndw.

Example 2:

You have inadvertently copied the wrong elements to layout 815.
1st step: exit the project in Allplan.
2nd step: delete file pb000815.000 or rename it pb000815.000.old.
3rd step: find file pb000815.000.bak and rename it pb000815.000.



Note:

These backup files can considerably increase the volume of data to be backed up. So it is a good idea to delete the .bak files you no longer require before you start backing up data. To delete the .bak files, you can select the Services application and click Utilities -> Delete temporary files.

You can also find this information in the help for Allplan. Please refer to the topic "Using bak files".

Download PDF  FAQ_EN_Using_bak_files.pdf
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 23.09.2019
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

I have installed a Windows update. Now the license is no longer available.
When I start Allplan, I can see the following error message: "This license is no longer available" or "CmActLicense runtime system is not installed!" How can I restore the license?




Answer:

CodeMeter Control Center always saves the license to a container with the number Allplan GmbH 128-XXXXXXX on your computer.

Start CodeMeter Control Center:
Open the Windows start menu and select CodeMeter -> CodeMeter Control Center. As an alternative, open Search by clicking the Search button on the Start screen and enter Codemeter.
Check the Licenses area to see whether there is the following container: Allplan GmbH 128-XXXXXXX.
The container must have a blue-green symbol and not a red symbol


Work through the following steps:

Step 1 Restart CodeMeterService
The local Windows service, which is used by licensing, must be running.

Restart this service:
CodeMeter Control Center -> Process -> Start CodeMeter Service
If the service is running, stop it and restart it.

Now check whether the Allplan GmbH 128-XXXXXXX container is displayed.

If this has solved your problem, all you need to do is exclude Codemeter from virus scans as described in the following document: https://connect.allplan.com/en/faqid/20151209133620.html

If the container is still not visible, go to step 2.


Step 2 Update the CodeMeter program
You can download the current version of CodeMeter Control Center from our Web Drive.

https://webdrive.allplan.com/s/4LrjrymoxESzC6p

The program is in the folder.
/Allgemein/Wibu/

(Click on the three buttons beside file size and choose 'Herunterladen')


Start the "CodeMeterRuntime.exe" file.
To do this, right-click this file and select
"Run as administrator".
Confirm all messages displayed and the defaults by clicking “Next”.
CodeMeter Control Center will be installed afterwards.

Now check whether the Allplan GmbH 128-XXXXXXX container is displayed.

If the container has a blue-green symbol, open the license settings:

Services application -> Utilities -> License settings -> License selection
You should see your licenses. Select the license. Try to start Allplan again.


Step 3 Contact Support
Send the following information by email.
If the container is still not visible or if it still has a red symbol, send us a screenshot of CodeMeter Control Center-> Licenses together with the license number, seat number or the Product Key.

Download PDF  FAQ_EN_No_valid_license_available.pdf
Version:  Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 06.11.2018 13:16
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

What can I do if Allplan does not start?


Answer:


Work through the following steps:

Step 1 - run as administrator
Start Allplan with the ‘Run as administrator’ option.
To do this, right-click the Allplan icon and click ‘Run as administrator’.
If Allplan does not start, go to step 2.

Step 2 - cleanup
Allplan is not running. Start the Services application and do the following:
Services application -> Service -> Hotline Tools -> cleanup -> OK
If Allplan does not start, go to step 3.

Step 3 - cleanstd
Allplan is not running. Start the Services application and do the following:
Services application -> Service -> Hotline Tools -> cleanstd: reset CAD defaults -> OK -> OK -> Yes -> OK
If Allplan does not start, restore the settings:
Services application -> Service -> Hotline Tools -> laststd: restore the last settings -> OK -> OK -> Yes -> OK
Go to step 4.

Step 4 - cleanreg
Allplan is not running. Start the Services application and do the following:
Services application -> Service -> Hotline Tools -> cleanreg: reset CAD registry settings -> OK -> OK -> Yes -> OK
If Allplan does not start, restore the registry settings:
Services application -> Service -> Hotline Tools -> lastreg:restore most recent CAD registry settings -> OK -> OK -> Yes -> OK
Go to step 5.

Step 5 (Allplan 2016 and later)
Restart the Wibu service:
Start CodeMeter Control Center.
To do this, use the Windows start menu and select CodeMeter -> CodeMeter Control Center. As an alternative, open Search by clicking the Search button on the Start screen and enter Codemeter.

CodeMeter Control Center -> Process -> Start CodeMeter Service
If the service is running, stop it and restart it.

If Allplan does not start, go to step 6.

Step 6 (Allplan 2016 and later)
Go to the Wibu website and install CodeMeter User Runtime Version for Windows (64-bit version).
You can find the installation program at https://www.wibu.com/de/anwendersoftware.htmlor on the Nemetschek FTP server ftp://nemhotline:ha37jvg8f@ftp.nemetschek.deat download/General/Wibu/CodemeterRuntime.exe

Start the ‘CodeMeterRuntime.exe’ file.
To do this, right-click this file and select
‘Run as administrator’.
Confirm all messages displayed and the defaults by clicking ‘Next’.
CodeMeter Control Center will be installed afterwards.
If Allplan does not start, go to step 7.

Step 7 - contact Technical Support
Send the following information by email to support.de@allplan.com:
a. An exact description of the last step before the error or crash occurred.
b. The error message itself (as a screenshot). To find out how to take a screenshot, look at
https://connect.allplan.com/en/faqid/0001cb36.html
c. A support request (Hotinfo) with question 01. To find out how to create a support request, look at
https://connect.allplan.com/en/faqid/20140528094911.html
d. The &apos;Allplan.out&apos; log file. To find out how to create a support request, look at
https://connect.allplan.com/en/faqid/0001a27a.html
e. Allplan 2016 and later -> a screenshot of the Wibu Control Center. To do this, use the Windows start menu and select CodeMeter -> CodeMeter Control Center. As an alternative, open Search by clicking the Search button on the Start screen and enter Codemeter.


We will contact you.

Download PDF  FAQ_EN_Allplan_does_not_start.pdf
Version:  Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Last modified: 22.08.2019
1 user(s) found this FAQ helpful

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects' resources to 'Project'.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for 'Pen and line definitions', 'Fonts', 'Patterns, hatching styles, area styles', 'Bar and mesh cross-section catalogs', 'Layer structures, line styles, drawing types' and 'Attributes proposed' from 'Office' to 'Project', if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the 'General' tab and select the 'Same folder name as project name' setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing 'project.dat' file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Download PDF  FAQ_EN_Switching_from_single_installation_to_network...
Version:  Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013  | Last modified: 21.09.2018
3 user(s) found this FAQ helpful

Question:

How can I restore a lost building structure or layout structure?



Answer:

To restore a lost or corrupt building structure or layout structure, you can do the following:

  • Close Allplan.
  • Open Windows Explorer, go to the central file storage folder of Allplan and open the "Prj"folder. Open the corresponding project folder and the "BIM" subfolder.

    Note:
    If the "Same folder name as project name" option is not selected for the project, a number is used for the folder name in the "Prj"folder. In this case, open the Services applicationand select the woprohotline tool (Services application -> Service -> Hotline Tools -> wopro). Select the corresponding project by double-clicking its name. An information dialog box shows the folder and file name of the project.
  • You can find an XML file for each structure in the BIM subfolder.


Building structure:
Allplan_BIM_BuildingStructure.xml

Objects derived from building structure:
Allplan_BIM_Views.xml

Plane model:
Allplan_BIM_LevMo_"name of model".xml

Layout structure:
Allplan_BIM_LayoutStructure.xml

  • To restore the building structure from a backup, rename the existing file "Allplan_BIM_BuildingStructure.xml" "Allplan_BIM_BuildingStructure.xml.old", for example.
  • Switch to the "Backup"folder, which you can also find in the"BIM"folder.
  • Select the most recent file that had been created beforethe building structure was deleted, for example, "Allplan_BIM_BuildingStructure.xml.27.5.2008--10-32-21.bak". The characters in bold indicate the date and time of the backup. Copy this file to the "BIM"folder.
  • Rename this file by deleting the characters after ".xml". Now the file name is "Allplan_BIM_BuildingStructure.xml".
  • Restart Allplan. The last version of the building structure is displayed in the "Open on a project-specific basis"dialog box again.




Note:

Using Allplan 2009-2 and later, you can restore the layout structure from a *.bak file straight from the "Open on a project-specific basis: layouts"dialog box.

  • Right-click the topmost structural level in the layout structure (project name) and select Load layout structure favoriteon the shortcut menu.
  • Open the last version of the Allplan_BIM_LayoutStructure.xml file in the backup folder mentioned above.


If the *.bak files are not displayed, please follow the steps described above.

Download PDF  FAQ_EN_Restoring_building_structure_layout_structure...
Version:  Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015  | Last modified: 22.02.2018
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I copy bar reinforcement including views and sections created with the tools in the "Associative Views" module if, for example, I want to use slab reinforcement for another floor?
I want to place the copied reinforcement and the views in new, separate drawing files and then adjust the reinforcement, keeping the layout of the copied sections. Only the changes in the copied reinforcement should automatically be added to the sections.


Answer:

First, open ProjectPilot (File -> ProjectPilot) and copy the drawing files with the reinforcement and the drawing file with the associative views and sections to new drawing files. ProjectPilot asks you whether you want to copy the linked drawing files as well. Click No.

If there are views or sections containing only data you do not want to move (for example, only model data), select Create -> Engineering Views, Details -> Associative Views -> Add to Viewand add the data you want to move (for example, reinforcement) to these views or sections. You can remove the data later.


The copied drawing files still reference the original drawing files. The next step is to delete those references.

To do this, open the drawing files you just copied. Select Change -> Engineering Views, Details -> Associative Views -> Manage Reference Drawing Filesand remove the references to the source drawing files.



When you have removed all links to drawing files you do not want to move, select the new drawing files with the views and the reinforcement.


Select all data by pressing <CTRL>+A and move the data as you need.
You can move the data in the X, Y and Z directions in plan or define any spatial displacement in isometric view.

You can then add the associated model data to the views and adjust the reinforcement.

Note:

Once deleted, you cannot restore any references to drawing files. Therefore, make sure you delete the right references. Allplan deletes empty views or sections automatically.

Download PDF  FAQ_EN_Copying_reinforcement_with_associative_views_...
Version:  Allplan 2017 / Allplan 2016  | Last modified: 09.10.2017
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

The license has not been available since I installed a Windows update.
Similarly, a valid license is no longer available after installing the Allplan 2017-0-4 hotfix or after upgrading from Allplan 2016 to Allplan 2017-0-4. How can I restore the license?



Answer:

Install Hotfix 2017-0-5. Allplan automatically installs available hotfixes when it starts.

You can find more information on hotfixes in the following FAQ:
https://connect.allplan.com/en/faqid/20101203111503.html

Start Allplan as Viewer and allow installation.


Alternative:
Go to the Wibu website and install CodeMeter User Runtime Version 6.30d for Windows (64-bit version).
You can find the installation program at https://www.wibu.com/de/anwendersoftware.htmlor on the Nemetschek FTP server ftp://nemhotline:ha37jvg8f@ftp.nemetschek.deat download/General/Wibu/CodemeterRuntime.exe

Start the "CodeMeterRuntime.exe" file.
To do this, right-click this file and select
"Run as administrator".
Confirm all messages displayed and the defaults by clicking ‘Next’.
CodeMeter Control Center will be installed afterwards.

After installation, you can see your license again and Allplan starts without problems.


Note:

When you install Allplan 2017-0-4, CodeMeter User Runtime Version 6.30c will be installed automatically. In some cases, this makes the license container created by Allplan useless.
You fix the container by installing the Hotfix 2017-0-5 or CodeMeter User Runtime Version 6.30d.

Download PDF  FAQ_EN_No_valid_license_after_updating_Windows_or_in...
Version:  Allplan BCM 2014 / Allplan BCM 2013 / Allplan BCM 2012 / Allplan BCM 2011 / Allplan BCM 2009  | Last modified: 28.07.2015
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I export and import projects using Allplan Building Costs?



Note:


The following FAQ describes this topic only briefly.
For detailed information, please refer to the help by clicking Help -> Contents and Index:
Backing up data and archiving projects -> Backing up and archiving projects using archive administration -> Backing up projects


Note:

If you have received data from us or if you send data to us, please read the &apos;Important information&apos; section at the end of this FAQ!

Exporting:

  • SelectProject data -->Archive...; the Archive Administration dialog box opens.
  • Click Pathand set the archive folder.
  • Please make sure that Formatis set to Archive (version 4.0 and later).You can find this setting at bottom right.
  • Select the project you want to archive in the list box on the left.
  • ClickArchive projectto start backing up the data.
  • The project appears in the list box on the right.
  • As a result, the program has created an XXX.arafile.


Importing:

  • StartAllplan Building Costs.
  • SelectProject data -->Archive...
  • Click Pathand set the archive folder.
  • The project appears in the list box on the right; select it and click Restore archive.
  • If the program asks whether you want to create a copy, you are advised to do this to protect existing data.
  • The project appears in the list box on the left; you can now edit it.




Important information:

You can use this type of archiving to back up project data. Please note that this backup does not contain the complete database!
This type of archiving is very useful if you want to transfer data to technical support.
If you send a project, please do not forget to provide us with a detailed description of the problem.
This description should include the following information:

  • Program and version
  • When does the error occur? Or what did you do when the error occurred?
  • What does the error message say? A screenshot would be very helpful.
    (Pressing the Printkey copies the current contents of the screen to the Clipboard. Using CTRL+V, you can paste this screenshot into a Word document, save this file and send it to us.)
  • Office name or customer number and telephone number so that we can contact you.

We kindly ask you not to make any changes in the project in the meantime.

A note on fixed projects:
Please do not copy any data from a corrupt project to a fixed project as this may transfer the corrupt data to your current project!

Download PDF  FAQ_EN_Exporting_importing_projects_.pdf
1 - 10 (11)
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z |
https://connect.allplan.com/ uses cookies  -  More information

Accept