Search Result

51 - 60 (117)
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017  | Last modified: 01.10.2019
1 user(s) found this FAQ helpful

Question:

How can I install additional Allplan workstations on an existing network (with or without Workgroup Manager)?



Answer:

Before you install the additional workstations, find out the path to the central file storage folder on a computer where Allplan has already been installed. Open the Services application on this computer. The Services application window shows the path to the central file storage folder.

Enter this path when Setup prompts you to specify the central file storage folder.
Select "Minimum" for the Setup type.



Notes:

  • Make sure the version you are installing is the same as the one installed on the other workstations.
  • In addition, make sure all workstations are running either with Workgroup Manager or without Workgroup Manager. To find out whether Workgroup Manager is installed or not, open the Services application and check the menus: if you can see the Workgroup Manager menu, Workgroup Manager is installed.
  • Installing additional workstations does not affect the data (projects, ...) in the central file storage folder.
  • If you add new users to a new Allplan workstation, do not forget to add them to the Workgroup Manager, too.
  • Version 2014 and earlier: if one of the computers also serves as the Allplan server, you cannot use the approach described above to find out the path to the central file storage folder.
    In this case, you will see the path to a local folder instead of the central file storage folder.
    Use a different computer to find out the path to the central file storage folder.
Download PDF  FAQ_EN_Installing_Allplan_on_a_network_later.pdf ...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 03.03.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

I have installed a Windows update. Now the license is no longer available.
When I start Allplan, I can see the following error message: "This license is no longer available" or "CmActLicense runtime system is not installed!" How can I restore the license?




Answer:

CodeMeter Control Center always saves the license to a container with the number Allplan GmbH 128-XXXXXXX on your computer.

Start CodeMeter Control Center:
Open the Windows start menu and select CodeMeter -> CodeMeter Control Center. As an alternative, open Search by clicking the Search button on the Start screen and enter Codemeter.
Check the Licenses area to see whether there is the following container: Allplan GmbH 128-XXXXXXX.
The container must have a blue-green symbol and not a red symbol


Work through the following steps:

Step 1 Restart CodeMeterService
The local Windows service, which is used by licensing, must be running.

Restart this service:
CodeMeter Control Center -> Process -> Start CodeMeter Service
If the service is running, stop it and restart it.

Now check whether the Allplan GmbH 128-XXXXXXX container is displayed.

If this has solved your problem, all you need to do is exclude Codemeter from virus scans as described in the following document: https://connect.allplan.com/en/faqid/20151209133620.html

If the container is still not visible, go to step 2.


Step 2 Contact Support
Send the following information for analysis by e-mail to support.de@allplan.com:
If the container is not displayed, or is still displayed with a red symbol, please send us

1. a screenshot of the Codemeter Control Center. License tab.
Either found in the Windows Start menu via CodeMeter -> CodeMeter Control Center. Or enter Codemeter in the search bar on the start page.

2. the computer name from which the screenshot was taken. (can be found on the start page of the Allmenu->second line "Computer Name")

3. the license/workstation number, or the product key used

Download PDF  FAQ_EN_No_valid_license_available.pdf
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018  | Last modified: 17.07.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can Allplan be operated under a QHD / UHD / 4K resolution?


Answer:


Starting with Allplan 2018, a query will appear in the Allplan Start under a QHD / UHD / 4K resolution (from 2560 x 1600), in which you can decide whether the operating system scaling should also be used in Allplan. This choice can be changed at any time in the Allplan Options-> Desktop Enviroment- > Display-> Scaling of the user interface.

Note:

If this option is switched on, Allplan uses the scaling level, which is set globally in the display settings of the operating system. Side effects of this scaling can be slight blurring in the symbols, drawing elements, and dropped graphics in Allplan.
Please note that this functionality is only available from Windows 8.1 and higher.

Download PDF  FAQ_EN_Notebooks_and_screens_with_QHD_UHD_4K_resolut...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013  | Last modified: 25.11.2019
3 user(s) found this FAQ helpful

Question:

How can I restore a lost building structure or layout structure?



Answer:

To restore a lost or corrupt building structure or layout structure, you can do the following:

  • Close Allplan.
  • Open Windows Explorer, go to the central file storage folder of Allplan and open the "Prj"folder. Open the corresponding project folder and the "BIM" subfolder.

    Note:
    If the "Same folder name as project name" option is not selected for the project, a number is used for the folder name in the "Prj"folder. In this case, open the Services applicationand select the woprohotline tool (Services application -> Service -> Hotline Tools -> wopro). Select the corresponding project by double-clicking its name. An information dialog box shows the folder and file name of the project.
  • You can find an XML file for each structure in the BIM subfolder.


Building structure:
Allplan_BIM_BuildingStructure.xml

Objects derived from building structure:
Allplan_BIM_Views.xml

Plane model:
Allplan_BIM_LevMo_"name of model".xml

Layout structure:
Allplan_BIM_LayoutStructure.xml

  • To restore the building structure from a backup, rename the existing file "Allplan_BIM_BuildingStructure.xml" "Allplan_BIM_BuildingStructure.xml.old", for example.
  • Switch to the "Backup"folder, which you can also find in the"BIM"folder.
  • Select the most recent file that had been created beforethe building structure was deleted, for example, "Allplan_BIM_BuildingStructure.xml.27.5.2008--10-32-21.bak". The characters in bold indicate the date and time of the backup. Copy this file to the "BIM"folder.
  • Rename this file by deleting the characters after ".xml". Now the file name is "Allplan_BIM_BuildingStructure.xml".
  • Restart Allplan. The last version of the building structure is displayed in the "Open on a project-specific basis"dialog box again.




Note:

Using Allplan 2009-2 and later, you can restore the layout structure from a *.bak file straight from the "Open on a project-specific basis: layouts"dialog box.

  • Right-click the topmost structural level in the layout structure (project name) and select Load layout structure favoriteon the shortcut menu.
  • Open the last version of the Allplan_BIM_LayoutStructure.xml file in the backup folder mentioned above.


If the *.bak files are not displayed, please follow the steps described above.

Download PDF  FAQ_EN_Restoring_building_structure_layout_structure...
Version:  Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014  | Last modified: 20.08.2019
Not voted yet. Be the first to vote this FAQ as helpful!

Questions:

Why can’t I see anything in a project or why are elements missing from drawing files?
Why are layers not visible?
Why is it not possible to select a privilege set in layer selection?



Answer:

Probably, you have not yet been assigned any privilege sets or the layers are frozen in the privilege set in question. First, check whether you can select another privilege set.


1. Selecting another privilege set

To do this, select the project in question and open the layer settings(Format -> Select, Set Layers). Go to the “Privilege set in list box” area at the top on the right and check whether you can select another privilege set (for example, ALLPLAN).
By default, all layers have full access rights in the predefined ALLPLAN privilege set.

If there is no privilege set with full access rights, you should assign the privilege sets correctly.
This can only be done by a user with administrator privilegesor, in the case of a project-specific layer structure, by the project owner.

Thus, log on as a user with administrator privileges and do the following:


2. Assigning a privilege set

Select the project with the frozen layers.

Open the layer settings(Format -> Select, Set Layers). Switch to the "Privilege Set" tab and click Define, modify privilege set.

Select the relevant user and assign the privilege set using the arrows.

Click OKto confirm.


3. Adjusting layers’ access rights in the privilege set

Finally, check the access rights of the layers in the privilege set assigned.
Go to the "Privilege set in list box" area at the top on the right and select the relevant privilege set (for example, ALLPLAN).

Check the area on the left to see whether there are frozen layers (gray or white). To change this, select these layers or simply select all layers using CTRL+A. Then click the Full access right (modifiable)icon in the “Change rights” area.
Click OKto confirm.

The next time you open this project, you can select this privilege set in the layer settings. You can then see all layers and set them to modifiable.

Do the same with print sets.


Alternative:

Since version 2006, the administrator has been able to select Show all users all print sets and privilege setsin the “Administrator options” group on the “Privilege Set” tab (“Design group” in version 2006). Thus, you do not need to assign new users to privilege sets. This option applies to all projects.

However, as soon as a user has been given a privilege set or print set, this option no longer applies to this user.



Note:

As a project can have its own layer structure, it is essential that you check the privilege set in the correct project.
To find out whether a project has its own layer structure, click
File -> New Project, Open Project-> right-click the relevant project -> Properties. Check whether the path settings for Layerstructuresare set to Officeor Project.

Download PDF  FAQ_EN_Enabling_privilege_set_for_user.pdf
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013  | Last modified: 25.11.2019
4 user(s) found this FAQ helpful

Question:

How can I install a hotfix?


Answer:

Allplan automatically downloads hotfixes and installs them the next time you start Allplan.
To define settings in Allplan, open the ? menu and select Update Allplan.

Click the Find now button to find updates and install them the next time you start Allplan.


Notes:

1. Downloading hotfixes manually

You can also download hotfixes manually.
Open our homepage
(http://www.connect.allplan.com) and select
Downloads.

The current hotfix and previous hotfixes are available for download.
Before you can download data, you must log in to Allplan Connect


2. Installing hotfixes downloaded manually

You can install the hotfixes downloaded by double-clicking the file. Make sure both Allplan and the Services application are closed.
Hotfixes are installed one after the other in the correct order. In other words, you must download and install Hotfix 2014-1-1 before you can install Hotfix 2014-1-2.


3. Working with Workgroup Manager

If you work with Workgroup Manager and another user has already downloaded the hotfix, you can see the following message:

There are currently no updates available.

In tis case, the hotfix is in the Downloadfolder on the server. In Allplan select ?-> Update Allplan. Choose one of the following options to install the hotfix the next time you start Allplan:

  • Install updates automatically-> the next time you start Allplan, the program will install the hotfix without asking you again.
  • Download updates, install manually (recommended)-> the next time you start Allplan, a dialog box opens and you can decide whether you want to install the hotfix.


The default setting is
'Download updates, install manually (recommended)'.

Download PDF  FAQ_EN_Installing_hotfixes.pdf
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 24.10.2019
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

Why is it not possible to install IBD planning data?
Why does Allplan not accept my activation code?



Answer:

If you have just installed Allplan or if you have used a trial license until now, start Allplan once with your license so that Allplan saves your customer number.
Make sure you install the correct IBD package.

IBD provides additional wizards you can use in Allplan. However, you have to purchase these additional wizards.
Should you have any questions (costs, use), please contact your sales partner.


Some notes on IBD:

IBD CAD Planning Data(building construction, industrial construction, ...) are wizards you can use in Allplan. Consequently, you can only install these wizards on a computer running Allplan.

IBD Building Components(building construction, building alteration, ... ) build on BCM/Nevaris.
If you use Nevaris, you must install IBD building components on a computer running Nevaris andAllplan.
If you want to use IBD building components for BCM, you must install this package on a computer running Allplan BCM.
As you can see, it matters whether you are trying to install IBD building components for Nevaris or BD building components for BCM.
You can find both packages on Allplan Connect.


Make sure you download the right package from Allplan Connect.

You get activation codes for the IBD packages you purchase.
You can see your activation codes on Allplan Connect at http://connect.allplan.com/license.

Pay attention to uppercase and lowercase letters in Setup.

You can find the IBD packages on Allplan Connect at
https://connect.allplan.com/de/support/downloads.html
(requires login details for Allplan Connect)

You can filter by version, such as Allplan IBD Version 2016.


Note:

There is no trial license for IBD. This means that you cannot install IBD if you run Allplan with a trial license.

You can install two IBD packages for free. You do not require codes for IBD CAD Basic Planning Data and IBD CAD Building Alteration Data. You can also find these packages on Allplan Connect.

Download PDF  FAQ_EN_IBD_installation_IBD_licensing.pdf
Version:  Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012 / Allplan 2011 / Allplan 2009 / Allplan 2008  | Last modified: 02.09.2016
4 user(s) found this FAQ helpful

Question:

How can I transfer the NemSLock license permanently to a new computer?



Answer:

Proceed as follows:

  • Install the program on the new computer. Use the temporary license (xxx_xxx_psd.nslock) you received when you purchased the program. If you do not have a temporary license of the current version, contact your support team to request such a license.
    You can then work with the program for 30 days – plenty of time to configure your new computer, transfer the office standard and projects and so on (you can find instructions in the FAQ database).
    At the same time you can work with the program on your old computer without any restrictions.
  • When you have transferred everything you need, return the license to us. To do this, use the old computer and click
    Start -> (All) Programs -> Nemetschek -> Nemetschek SoftLock 2006 -> License Manager
    (Services application -> Utilities -> License -> License Manager (NemSLock)).

    Click "Relocate licenses -> Transfer licenses permanently to a computer". This creates the COMPUTER_NAME.hrdwchg file. Send this file by email to register@nemetschek.de.


Tip: Click 'Browse' in the 'Send hardware change file (*.hrdwchg)' dialog box. The program creates and saves the COMPUTERNAME.hrdwchgfile. Then Windows Explorerstarts and the folder with the hardware change file opens. You can now use all the options provided by Windows Explorer: for example, you can attach the file to an email, copy it to a computer having Internet access and so on. Email this file to register@nemetschek.de.

Note:
After you have created this file, the Allplan license of your old computer will still be valid for two more days.
As soon as we have removed the registration, we will send you a confirmation by email.

  • Create a registration request (register.txt) on the new computer and send this file by email to register@nemetschek.de.

    To generate a registration request, do the following:
    Open the License Manager (Service application -> Utilities- > License -> License Manager). Select the license entry for your seat and click "Request license". Please follow the instructions displayed on screen. Complete the form. Do not forget to enter your email address.

    You will promptly receive the license for the new computer (provided you have returned the license to us as described above).
    Installing this license file completes the license transfer to the new computer.



Note:

The COMPUTER_NAME.hrdwchg file is stored in the following folder:

Allplan 2012 and earlier:

  • Windows 64-bit:

C:\Program Files (x86)\Common Files\Nemetschek\NemSLock2006\License

  • Windows 32-bit:
    C:\Program Files\Common Files\Nemetschek\NemSLock2006\License


Allplan 2013 and later:

  • C:\ProgramData\Nemetschek\NemSLock\AllplanLicense
  • or C:\ProgramData\Nemetschek\NemSLock\HardwareTausch
Download PDF  FAQ_EN_Transferring_NemSLock_license_permanently_to_...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Last modified: 30.01.2020
1 user(s) found this FAQ helpful

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects' resources to 'Project'.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for 'Pen and line definitions', 'Fonts', 'Patterns, hatching styles, area styles', 'Bar and mesh cross-section catalogs', 'Layer structures, line styles, drawing types' and 'Attributes proposed' from 'Office' to 'Project', if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the 'General' tab and select the 'Same folder name as project name' setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing 'project.dat' file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Download PDF  FAQ_EN_Switching_from_single_installation_to_network...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2017 / Allplan 2016 / Allplan 2015  | Last modified: 12.06.2020
1 user(s) found this FAQ helpful

Question:

What can I do if Allplan no longer starts after I have upgraded and the following messages appear?
Allplan
Stop

...

After this, Quality Reporter displays an error report.



Answer:

Exit Allplan on all workstations and do the following:
Open the Services application and make a note of the path to the 'central file storage folder', which is displayed in the Services application window.
In addition, check whether the workgroup manager line is followed by 'Yes' or 'No'.

Open the central file storage folder in Windows Explorer.

If the workgroup manager line is followed by
'Yes', open the NET subfolder.
'No', open the PRJ subfolder.

Find the 'project.dat' or 'project.Dat.xm' file in the NET or PRJ folder and rename it 'project-old.dat'.

After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> OK -> Restore project management file -> OK
The program creates a new, correct project management file and you can start Allplan again.



Note:

If you come across error messages while doing this, please email the following information to support@allplan.com:

  1. Describe exactly what you did before the error or crash occurred.
  2. The error message itself (as a screenshot).
  3. The log file (trace).
    https://connect.allplan.com/en/faqid/0001a27a.html
  4. A Hotinfo support request with question 01.
    https://connect.allplan.com/en/faqid/20130823123806.html
Download PDF  FAQ_EN_Allplan_does_not_start_after_upgrade_Stop_mes...
51 - 60 (117)
https://connect.allplan.com/ uses cookies  -  More information

Accept