Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 01.10.2020
 

Question:

What are the differences between a major release, a service release and a hotfix?



Answer:

Major release

The major release is the first release of a new version.
You can download it from the homepage.

Download:
www.connect.allplan.com -> Download -> Software packages
(requires login details for Allplan Connect)

Name (example):
Allplan 2015


Service release

A service release is a collection of improvements to the program, including all the service releases and hotfixes that have been released until now. In addition to improvements, it may also include new features.
You can also use a service release for a new installation or an upgrade (from a previous version).
You can download it from the homepage.
New customers get it as a DVD. Serviceplus customers get it on request.
In addition, they automatically get information about service releases.

Download:
www.connect.allplan.com -> Download -> Software packages
(requires login details for Allplan Connect)

Name (example):
Allplan 2015-1


Hotfix

A hotfix is an improvement to the program that will automatically be installed by Allplan Update.
The basis for the installation is a specific major release or service release.
Hotfixes are installed one after the other in the correct order, that is to say, first Hotfix 2015-1-1 and then Hotfix 2015-1-2.

Allplan automatically installs available hotfixes when it starts.

You can find more information on hotfixes in the following FAQ:
https://connect.allplan.com/en/faqid/20101203111503.html




Tip:

Install program updates as soon as they are available.

Download PDF  FAQ_EN_Program_updates.pdf
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 01.12.2020
 

Question:

How can I fix Allplan program data?


Answer:

You can fix Allplan program data by renaming the program folders and installing an update.
Due to the new names, Allplan cannot find the resources during the update. Consequently, it creates new resources.

To fix Allplan program data, do the following:

You need the latest installation package for your version.
You can download this package from Allplan Connect (www.connect.allplan.com) or from our FTP server.

Accessing the FTP server:
Enter the following address in Windows Explorer (do not use Internet Explorer!):
ftp://nemhotline:ha37jvg8f@ftp.nemetschek.de

You can find the installation packages in the following path:
/download/Allplan/"version"/CD/
Copy the zip file to the local computer and unzip the file.

  • Open the Services application of the Allplan version you want to fix.
  • Select Service -> Windows Explorer -> CAD program folder.
  • Rename the "PRG" folder "PRG_OLD". If Windows Explorer tells you that a file is still in use, restart the computer and try again.
  • Start the *.exe file of the installation package you just unzipped.
  • Select "Update installation".
  • When Setup prompts you for the license, select "Current license file" or "Use active license".
  • Select "Minimum" for the Setup type.



Allplan gets new program resources during installation.
As soon as the installation is complete, you can test how Allplan behaves.


Note:

If you are not sure, give these instructions to your system administrator.
Keep in mind that you install the version of the installation package you downloaded. This means that you may have to reinstall any subsequent hotfixes.

Download PDF  FAQ_EN_Fixing_Allplan.pdf
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014  | Last modified: 30.09.2020
 

Question:

How can I check out a computer and continue to work as a normal CAD user with my usual settings and permissions?



Answer:

Install the "Microsoft Loopback Adapter" driver.
This driver is necessary so that network services are running on the computer all the time.
Go to Allplan Connect for a detailed description: https://connect.allplan.com/en/faqid/000162ae.html


Sign in as the Allplan administrator to the computer.


Step 1: add the computer to workgroup manager
You must add the computer to the workgroup so that you can store data (data server) on this computer. Do the following:

Create data folders:
Create a folder - for example, “Nemdata” - on the computer and share it (full control).
Create the “Allplan” subfolder in this folder. Create two subfolders - “usr” and “prj” - in the Allplan folder.
In this example: “...\Nemdata\Allplan\prj” and “...\Nemdata\Allplan\usr”

To share a folder for the Allplan file storage

  1. Start File Explorer on the computer that you want to use for file storage and switch to the folder that you want to share (in this example, the “Nemdata” folder).
  2. Right-click the folder that you want to share and select Give access to -> Specific peopleon the shortcut menu.
  3. Select Everyoneand click Share.


Add computer:

  1. Start the Services application as the workgroup administrator.
  2. Click and select Manage computers and projects.
  3. Click the Add any computer to Allplan workgroupicon and select the computer that you want to add.
  4. Select the “Allplan” subfolder under the share and click “OK” to confirm. This computer is now listed under workgroup server.


Note:If you have problems adding the computer to workgroup manager, read the following instructions:
https://connect.allplan.com/en/faqid/20200317162849.html



Step 2: define project owner
A user can only move a project if the user is the owner of this project.
The ownership of a project can only be changed by an Allplan administrator (or the owner of the project).
Allplan -> File -> ProjectPilot ->
Go to the “Projects” node, right-click the required project and click Propertieson the shortcut menu.
Define the owner.


Step 3: move projects
Sign in as the user who wants to check out the computer.
Select the Services application -> Workgroup Manager -> Manage computers and projects.
Click the main server and select the project that you want to move.
Drag the projects one after the other to the computer to be checked out.

Important note: You can take projects with you in several ways.

1. You move the project to the computer.
Move project: Drag the project to the destination computer, or open the shortcut menu of the project and click “Cut”. After this, open the shortcut menu of the destination computer and click “Paste”.
After you have checked in the computer, move the project back to the server so that it is available to all and included in backups again.

2. You copy projects. Click a project, select and hold the Ctrl key and drag the project to the destination computer. Or: Open the shortcut menu of the project and click “Copy”. After this, open the shortcut menu of the destination computer and click “Paste”.

You can continue in two ways: Lock the original project on the server to protect it from changes. Consequently, nobody in the office can work on this project, but it is still on the server. When you check in the computer again, you unlock the project on the server, delete the project and copy your copy back to the server if you have changed the project.
Alternatively, both projects remain active. Consequently, both the project copied and the original on the server can be worked on. In this case, however, you must adjust the data manually when you are back in the office by copying the changed drawing files of the projects by using ProjectPilot.




Step 4: check out the computer
Select the Services application -> Workgroup Manager -> Manage computers and projects.
Click your computer and then click Check outin the lower-right area.
Confirm the message that tells you that there are still user folders on the computer to be checked out.
Enter a comment and click OK. Users in the office see this comment when they try to access a project that is on the computer that is checked out.
Specify the parts of the office standard you want to copy to the computer and click OK to confirm.
The first time you check out the computer, you must copy the office standard once so that the entire STD folder is on this computer. This is no longer necessary when you check out the computer afterward because the contents of the STD folder do not change very often.


Conclusion:

You can now remove the computer from the network and work on your projects when you are out of the office. To make sure that the projects are not changed in the office in the meantime, the projects that are on the computer checked out are locked for the CAD users on the network. These users see the comment you entered when you checked out the computer.



Notes:


Download PDF  FAQ_EN_Workgroup_Manager_checking_out_computer_and_w...
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 12.11.2020
 

Question:

Which graphics cards are recommended for Allplan?



Answer:


Follow this link to see a list of the AMD/ATI & NVidia graphics cards manufacturers that are CERTIFIED FOR ALLPLAN.
We have tested the OpenGL functionality and the animation performance of various Allplan modules with specially prepared data with each of the cards available.
https://www.allplan.com/services/cad-software-support/grafikkarten.html

The tested drivers can be found on the homepage of the individual manufacturer. The driver versions that were used in the tests are included in the tables so that you can compare the data. However, we strongly recommend that you always installthe current driver of the manufacturer.

It is a good idea to check your system using the system tool you can find on our homepage:
https://www.allplan.com/services/cad-software-support/downloads.html



Additional information:

Allplan 2011 was revised completely for accelerated graphical representation.
To guarantee full performance support for Allplan 2011 and later, please check that your graphics cards meet the hardware requirements for DirectX 10 & OpenGL 2.0 (chip-based). In addition, you need to install the current drivers. Allplan will automatically switch to the conventional drawing method when it starts and finds old graphics cards that do not meet the requirements stated above.

For more information on graphics card specifications, go to

http://en.wikipedia.org/wiki/Comparison_of_AMD_graphics_processing_units
http://en.wikipedia.org/wiki/Comparison_of_NVIDIA_graphics_processing_units#Quadro)



Note:

We kindly ask you to understand that products of other manufacturers that are not mentioned have not been tested and therefore cannot be recommended.

Download PDF  FAQ_EN_Recommended_graphics_cards_for_Allplan.pdf ...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Last modified: 30.01.2020
 

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects' resources to 'Project'.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for 'Pen and line definitions', 'Fonts', 'Patterns, hatching styles, area styles', 'Bar and mesh cross-section catalogs', 'Layer structures, line styles, drawing types' and 'Attributes proposed' from 'Office' to 'Project', if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the 'General' tab and select the 'Same folder name as project name' setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing 'project.dat' file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Download PDF  FAQ_EN_Switching_from_single_installation_to_network...
Version:  Allplan 2015 / Allplan 2014 / Allplan 2013  | Last modified: 30.11.2017 17:22
 

Question:

How to install and run NemSLock Server?



Answer:

Before installing, check whether the package you received includes the following items:

  • Temporary licenses for NemSLock Server, e.g. 1234567a_001_psd.nslsrv
  • Temporary licenses for clients, e.g. 1234567a_001_psd_client.nslock



How to install NemSLock Server

  • Start the Setup program for NemSLock Server. You can find the latest Setup program on our FTP server:

ftp://nemhotline:ha37jvg8f@ftp.nemetschek.de/download/Allplan/Lizenzserver/2014/allplan2014-nemslock-lizenz.zip

  • Select one of the temporary license files for NemSLock Server. These licenses are valid for 30 days. However, each license includes only one seat of each configuration purchased. The full number of seats purchased will be available to you as soon as you have installed the registered licenses (see below). If you purchased a configuration for one seat only, you will, of course, receive only one temporary license.
  • When you opt for the “Custom” setup type, you can choose between the following program features:
    Console
    You can use this program to administer NemSLock Server. You can also install the console on more workstations so that you can administer the server from a number of different locations. However, you can only connect one console to the server at any one time.
    Server
    The actual license server.
    Logviewer
    This tool analyzes the log files of NemSLock Server.

By default, Setup installs all these features.
If you have several temporary licenses for NemSLock Server, use the server console to install the remaining licenses after the installation. The procedure is described in the section "How to install licenses".


How to register licenses

  • Open NemSLock 2006 Server Console by clicking the corresponding icon on the desktop or by selecting Start -> All Programs -> NemSLock 2006 Server -> NemSLock 2006 Server Console.
  • Click "Modules" on the left.
  • Select the seat you want to register. If your license includes configurations for several seats, you must send a separate registration request for each seat. You will then receive a registered license file for each seat. You must install each file.
  • Click the "Registration request (register.txt)" button.
  • Click "Edit".
  • You must fill out all fields marked with an asterisk (*). Make sure you enter your email address correctly, because the registered license file will be sent to this address (and not to the address of the person who sent the registration request!). Click OK to confirm.
  • Click "Create registration request". Windows Explorer opens and shows the register.txt file. If this window is closed, you can find this file in the program folder of NemSLock Server. If you installed the program to the path proposed, the path is:
    C:\Program Files (x86)\Nemetschek\NemSLock Server 2006\Programs\License
  • Now you can use all the options provided by Windows Explorer to copy the registration file to a computer with Internet access on the network. Alternatively, you can also use an USB stick. You can then email this file to us.
  • Send the email with the registration request to register@nemetschek.de



How to install licenses

  • Open NemSLock 2006 Server Console.
  • Click "Stop server" on the left.
  • Click "Modules" on the left.
  • Click "Browse" to navigate to the registered license file.
  • Click "Install license file".
  • After this, you can start the server again by clicking "Start server".



How to set up users (optional)

  • predefined user ALLis created automatically. If there is no other user, each user is given the privileges of the user ALL. By default, this user can use all licenses but cannot check out any licenses. By double-clicking the user, you can change the user's privileges.
  • predefined user ALLallows all users to use licenses. In order to do this, the users must be able to access the server. You do not need to create individual user profiles until you want to assign specific rights to individual users or limit access to selected users. predefined user ALL. If you want to work only with individual users, you should deactivate the predefined user ALL by revoking the user's right to use licenses.
  • predefined user ALL has administrator privileges unless another user is created and appointed as the administrator. As soon as you have appointed an administrator, ALL no longer has administrator privileges.
  • You can enter users in the “Users.mcf” file. predefined user ALL has administrator privileges again. In addition, each user can once again administer the license server using the console.
  • The administrator user is not a special user. If there are several administrator users, only one administrator user can start the console for this license server at any one time.
  • If you are setting up users without giving administrator privileges to anyone, the program will ask you whether you want to appoint yourself as the administrator.


You can also specify a domain (user authentication for Windows server). However, this is not mandatory. If you do not specify a domain, the program uses the Windows user name for each user.

The program writes the user accounts and the associated access rights as ASCII text to the users.mcf file.

You can find this file in the \Programs folder of the NemSLock Server installation. You cannot rename, delete or move this file. If the program can no longer connect to this file, you must exit NemSLock Server, restart it and enter all users again from scratch. predefined user ALLis retained.

Note:
Experienced administrators can use the PowerShell script NemGenUsers.ps1. This file is in the \Programs folder of the NemSLock Server installation or you can find it as an FAQ in Allplan Connect:

connect.allplan.com/en/faqid/20120907161911.html



How to install and configure clients

  • Use one of the nslock license files you received to install the clients. Do not use the trial license or the license server license. It is irrelevant which of the client licenses you use, as the actual license will come from the license server later.
  • You do not need to register the clients.
  • When switching from Hardlock to NemSLock (server), you need to update the client using a nslock license file.


After having installed the client, you need to switch to the license server:

  • Start -> (All) Programs -> Nemetschek -> Nemetschek SoftLock 2006 -> License Manager
  • If the license server window is not visible, select "Configure NemSLock Server" at the bottom. Lock this window. All you need to do is click the drawing pin icon.
  • Enter the computer name or IP address of the license server in the empty box. Then click the "Update” icon to the right.
  • Now the user can select one of the seats provided.
  • After having successfully connected to the license server, clear the check boxes for the trial licenses in the area at the top.
  • Click "Close" to complete the configuration. Now you can start Allplan.



Notes:

  • If a user selects several configurations for a seat and starts Allplan, the license server will provide the required licenses; in other words, starting Allplan once might require two licenses. Consequently, fewer licenses are available to other users.
  • 2014-1 and later: If the latest version of License Manager is installed (file version 1. 0. 26. 153 or later, see License Manager- Options- System), you can also select several licenses. If one of the selected licenses is currently being used by someone else, the program will automatically select the next available license.
  • Clients communicate with the server by TCP/IP via port 10977. So you need to configure the firewall accordingly.
  • The license server and the licenses are downward compatible; they can be used in conjunction with older Allplan versions.
Download PDF  FAQ_EN_Installing_and_configuring_NemSLock_Server.pd...