Question:

Allplan does not react promptly or seems to hang after I have selected the "Open on a Project-Specific Basis" or "New Project, Open Project" tool.

One of the following virus scanners is running: Trendmicro, McAfee, Kaspersky, Avira, F-Prot and others.
What can I do to solve this problem?



Answer:

Check whether updating the software of the virus scanner solves the problem.

If it doesn't, configure the real time scanner of the virus scanner so that it no longer scans the program folder and data folder of Allplan.

Start the Services application. Make a note of the following paths displayed in the Services application window:

Program folder
General program data
Central file storage folder

Define these folders as exemptions in your virus scanner.


Bear in mind that virus scanners may be installed on the server and the clients (provided you work with a server).
For more information on the virus scanner, contact the manufacturer.

Версия:  Allplan 2019  | Последнее изменение: 12.11.2018

Information:

This document provides further information on installing Allplan 2019.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2019.


How to install


You can find detailed instructions on how to install Allplan 2019 in the following places:

- After you have downloaded and unzipped Allplan 2019, you can find the ‘install.chm’ file in the following folder: C:\Users\Public\Documents\Allplan 2019\HelpFiles\English.

- Use the following link:
https://webdrive.allplan.com/s/4LrjrymoxESzC6p and open the General\Installation help\2019 folder.


Please read these instructions before you install Allplan 2019.

System requirements for Allplan 2019

https://connect.allplan.com/en/faqid/20180608093815.html

How to handle licenses when upgrading to Allplan 2019

https://connect.allplan.com/en/faqid/20180608092654.html



Some notes on installing Allplan 2019

If you want to switch from Allplan 2016/2017/2018 to Allplan 2019, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2016/2017/2018.

1. First-time installation

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). Setup does not transfer any data or settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2019 and then upgrade from Allplan 2016/2017/2018.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from version

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). You can configure Setup to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2016/2017/2018 to the new installations folder.
This duplicates the data: You can use all projects, defaults and resources both in Allplan 2018 and in Allplan 2016/2017/2016. This way, you can test the new version without losing your 'old' Allplan version.
Bear in mind, though, that you should not mix data from different versions. Merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already used the second installation option to install <Product_Version> to a computer that accesses the same data server. As a result, the data are already available.

3. Upgrade and transfer data from Allplan 2016/2017/2018

This option installs Allplan 2019 to an existing folder, converting Allplan 2016/2017/2018 to Allplan 2019 and transferring all important settings. Afterwards, you can no longer work with Allplan 2016/2017/2018.
This does nor affect earlier Allplan versions (Allplan 2015 or earlier).


Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2019. Beforeyou start installing, make sure that all workstations can be upgraded. For technical reasons, it is not possible to mix installations of different major releases. Any related problems area not covered by service contracts.
  • During the upgrade, Allplan 2016/2017/2018 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.





Converting the data:

Data from earlier Allplan versions need to be converted to version 2019. Allplan 2019 automatically converts the data of a project you open. Click here for instructions on how to convert all projects in a single operation:

https://connect.allplan.com/en/faqid/20090408124904.html


IBD 2019

Click here for instructions on how to get your activation codes for Allplan IBD:

https://connect.allplan.com/en/faqid/20110912113530.html

Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017  | Последнее изменение: 25.11.2019

Question:

ProjectPilot does not open, displaying the following error message:
“Unable to create ProjectPilot control. Is the registry correct?” What can I do?



Answer:

Step 1
Start the Services application -> Service -> Windows Explorer -> CAD program folder.
Open the "PRG" folder.
Find the following file: "NemProjectPilot10.exe"
Right-click this file -> select "Run as administrator" on the shortcut menu.
Try to start ProjectPilot from Allplan.
If ProjectPilot does still not start, go to step 2.


Step 2
Check whether updating the software of the virus scanner solves the problem.
If it doesn't, configure the real-time scanner of the virus scanner so that
it no longer scans the program folder and data folder of Allplan.
Start the Services application: Make a note of the following paths displayed in the Services application window:
Program folder
General program data
Central file storage folder
Define these folders as exemptions in your virus scanner.
If ProjectPilot does still not start, go to step 3.



Step 3
This problem is often caused by an "external path" that no longer exists. When you start ProjectPilot,
the program tries to access the "external path", which is stored in the Windows Registry.
If this path no longer exists, you will see the above error message.

To correct this error, do the following:

  • Start the Services application -> Service -> Windows Explorer -> My own CAD documents (USR).
  • Find the "extern.cfg"file in the user folder and delete this file.


If ProjectPilot does still not start, go to step 4.



Step 4 (Windows 10 or later)
Open the PRG folder of Allplan in Windows Explorer (for example, C:\Programs\Allplan\Allplan 2018\prg).
Start the Services application. The folder you selected for the Allplan program during installation is displayed directly in the Services application window.
Right-click the "NemProjectPilot10.exe" file in the Allplan program folder. A shortcut menu opens. Click “Properties”.
Open the “Compatibility” tab and select the “Disable fullscreen optimizations” option. After having selected this check box, click “Apply” at bottom right.




If several users with different user profiles use Allplan on this computer, click the “Change settings for all users” button first. Then, disable fullscreen optimizations as described above.




If ProjectPilot does still not start, go to step 5.



Step 5
Fix Allplan.
To find out how, go to
https://connect.allplan.com/en/faqid/20120917082945.html
After installation, try to start ProjectPilot.
If ProjectPilot does still not start, go to step 6.



Step 6
If ProjectPilot does still not start, the most likely cause of this problem is security software such as the virus scanner.
Remove, that is, uninstall the local virus scanner with all its services from the Allplan computer having these problems.
After this, ProjectPilot will start.
To reinstall the security software or virus scanner with its appropriate settings,
contact the support service of the software provider.

Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017  | Последнее изменение: 01.10.2019

Question:

How can I install additional Allplan workstations on an existing network (with or without Workgroup Manager)?



Answer:

Before you install the additional workstations, find out the path to the central file storage folder on a computer where Allplan has already been installed. Open the Services application on this computer. The Services application window shows the path to the central file storage folder.

Enter this path when Setup prompts you to specify the central file storage folder.
Select "Minimum" for the Setup type.



Notes:

  • Make sure the version you are installing is the same as the one installed on the other workstations.
  • In addition, make sure all workstations are running either with Workgroup Manager or without Workgroup Manager. To find out whether Workgroup Manager is installed or not, open the Services application and check the menus: if you can see the Workgroup Manager menu, Workgroup Manager is installed.
  • Installing additional workstations does not affect the data (projects, ...) in the central file storage folder.
  • If you add new users to a new Allplan workstation, do not forget to add them to the Workgroup Manager, too.
  • Version 2014 and earlier: if one of the computers also serves as the Allplan server, you cannot use the approach described above to find out the path to the central file storage folder.
    In this case, you will see the path to a local folder instead of the central file storage folder.
    Use a different computer to find out the path to the central file storage folder.
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Последнее изменение: 28.10.2019

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects' resources to 'Project'.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for 'Pen and line definitions', 'Fonts', 'Patterns, hatching styles, area styles', 'Bar and mesh cross-section catalogs', 'Layer structures, line styles, drawing types' and 'Attributes proposed' from 'Office' to 'Project', if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the 'General' tab and select the 'Same folder name as project name' setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing 'project.dat' file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Версия:  Allplan 2017  | Последнее изменение: 09.10.2017

Information:

This document provides further information on installing Allplan 2017.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2017.


How to install:


You can find detailed instructions on how to install Allplan 2017 in the following places:

- After you have downloaded Allplan 2017, you can find the install.chm file in the Helpfiles\English folder.
- You can find the install.chm file on the Allplan 2017 DVD in the following folder: <DVD>:\programs\x64\Allplan\Helpfiles\English.

Please read these instructions before you install Allplan 2017.

Some notes on installing Allplan 2017

If you want to switch from Allplan 2014/2015/2016 to Allplan 2017, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2014/2015/2016.

1. First-time installation

This option installs Allplan 2017 to a new folder without affecting any other Allplan installation (2016 or earlier). Setup does transfer neither data nor settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2017 and then upgrade from Allplan 2014/2015/2016.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from Allplan 2014/2015/2016

This option installs Allplan 2017 to a new folder without affecting any other Allplan installation (2016 or earlier). You can configure the program to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2014/2015/2016 to the new installations folder.
This duplicates the data: you can use all projects, defaults and resources both in Allplan 2016 and in Allplan 2014/2015/2016. This way, you can test the new version without losing your &apos;old&apos; Allplan version.
Bear in mind, though, that you should not mix data from different versions, as merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already installed <Product_Version> and copied the data to a different computer that accesses the same data server. As a result, the data have already been transferred.

3. Upgrade and transfer data from Allplan 2014/2015/2016

This option installs Allplan 2017 to an existing folder, converting Allplan 2014/2015/2016 to Allplan 2017 and transferring all important settings. Afterwards, you can no longer work with Allplan 2014/2015/2016.
This does nor affect earlier Allplan versions (Allplan 2013 or earlier).



Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2017. Therefore, make sure you can upgrade all workstations (deadline for Serviceplus agreement: July 1, 2016) beforeyou start installing.
  • During the upgrade, Allplan 2014/2015/2016 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.



Converting data:

IBD 2017

IBD 2017 is expected to be released with the Allplan 2017-0-1 Hotfix at the end of July 2016.
https://connect.allplan.com/en/faqid/20160707142752.html


1 - 6 (6)
  • 1
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z |
https://connect.allplan.com/ uses cookies  -  More information

Accept