Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018  | Последнее изменение: 03.11.2020
4 user(s) found this FAQ helpful

Question:

  • Why can't I create elements?
  • Why can't I move a drawing?
  • Why are elements not created correctly?
  • Why does the program crash when I import a DXF file from the land registry office?
  • Why is the outline of a circumscribed area not detected correctly?
  • Why can't I calculate shadows?
  • Why are elements not displayed correctly in animation?
  • Why are parts of dimension text missing?
  • Why do the contents of the screen suddenly rotate?
  • Why can't I get a preview when I move or copy elements?
  • Why are areas not calculated correctly?




Finding the reason for these problems:

Check whether an offset is set in the project settings (File -> New Project, Open Project-> select the project and open the shortcut menu -> Properties; Allplan 2009 and earlier: Tools -> Options ->Advanced Draft -> Settings). If there are offset coordinates, clear the check box.

Select Tools -> Measure(->)Coordinates.
Click in the middle of the drawing in plan view.
If there are very large values (for example, x/y/z greater than 5000 m), you have found the reason for these problems.

The system has problems calculating and displaying data with very large coordinates. The more data you have with very large coordinates, the greater this effect.



Solution:

  • Click Tools -> Options... -> Desktop environment -> Generaland select Optimize working with large coordinates(Allplan 2009 and earlier: Tools -> Options -> Global Options -> Miscellaneous tab -> Optimize working with large coordinates). After this you must restart Allplan. Otherwise, this setting has no effect.

This is a user setting you must define separately for each user.

  • Usually, the best solution is to move the data towards the Allplan origin. Use the "Move" tool. When Allplan prompts you to specify the target point ("To point"), select Global point in the dialog line. You can find detailed information in the help for Allplan. Look for the Global pointtopic.



Note:

If the data are still not displayed correctly, do the following:
Exit Allplan -> Services application-> Service -> Hotline Tools-> cleanup -> start Allplan.

Загрузка PDF  FAQ_EN_Large_coordinates.pdf
Версия:  Allplan 2015 / Allplan 2014 / Allplan 2013  | Последнее изменение: 07.08.2019
10 user(s) found this FAQ helpful

Question:

After I updated Windows (8 to 8.1; 8.1 to 10), Allplan only starts as a viewer. What can I do?


Answer:

Windows update corrupts Nemetschek Softlock License Manager.
To fix Allplan, do the following:

You need the latest installation package for your version.
You can download this package from our webdrive

https://webdrive.allplan.com/s/4LrjrymoxESzC6p

You can find the installation packages in the following path:
Allplan/"Version"/Installationspaket/

Copy the zip file to the local computer and unzip the file.
Start the installation and run an update use our temporary license file.

You can download the temporary license from Allplan Connect:
https://connect.allplan.com


After the installation, you can open License Manager again (Services application -> Utilities -> License -> License Manager). Next, install the temporary license (*_psd.nslock): "Install - Install license"
Note: the status of the temporary license is set to "Expired".

Next, create a new registration request.
To generate a registration request, do the following:

Open License Manager (Services application -> Utilities -> License -> License Manager). Select the license entry for your seat and click "Request license".
Follow the instructions displayed on screen. Complete the form. Do not forget to enter your email address.

Check that the Client ID and CD Key are correct.

Send the registration request to: register@nemetschek.de.

Загрузка PDF  FAQ_EN_Fixing_NemSLock_after_Windows_update.pdf ...
Версия:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Последнее изменение: 30.09.2020
7 user(s) found this FAQ helpful

Question:

My computer does not have Internet access, but I would like to activate the license with the Product Key. What can I do?


Information:

The easiest way to activate and return Allplan licenses is to do this online. In other words, the computer has Internet access. However, you can also activate Allplan on a computer without Internet access (offline licensing). Offline licensing is particularly useful if some Allplan computers in your office do not have Internet access and do not use a license server either.

If the computer without Internet access and the computer with Internet access are neither close to each other (for example, the computer in the office hasInternet access, but the computer at home does not haveInternet access) nor connected with each other (for example, using LAN), offline activation is not very suitable, as you have to access both the computer with Internet access and the computer without Internet access.

Requirements for activating a license offline:

  • You have a valid Product Key.
  • You have installed Allplan on the computer without Internet access (for example, as a viewer).
  • You have another computer with Internet access.


Important: Activating a license offline involves two steps. In addition, you need to upload a receipt file so that you can return the license offline later.

There are the following basic steps:

  • Creating and uploading the license request file
  • Downloading and importing the license update file
  • Creating and uploading the receipt file


The online computer uses the following web page:
http://lc.codemeter.com/59885/depot/index.php


Note:

As both the license file and the receipt file are saved with the name of the container number by default, it may happen that you mix up these two files. Therefore we strongly recommend that you use meaningful names for the files. For example, the name could include the name of the computer and the Product Key or the words “license” and “receipt”.
This is particularly important if you want to activate several computers offline.


Answer:

A: Activating licenses offline

To activate licenses, use CodeMeter Control Center.

Start CodeMeter Control Center.
To do this, use the Windows start menu and select CodeMeter -> CodeMeter Control Center. An an alternative, go to the Windows search box and type Codemeter.

You can find the container numbers in the ‘License’ area.
If you have a stand-alone license, the name of this container is Allplan GmbH and its number is 327XXXXXXX.

Select this container and click Activatelicense on the right. Select
Create license request. Create a *.WibuCmRaC file for your container.

Take this file to a computer that is online.
Go to the following web page:
http://lc.codemeter.com/59885/depot/index.php

Enter your Product Keyin the “Ticket” line and click Next. You can now see your license.
Click Activate license.

You can see your license and all available updates, which should be selected. Click Offline License Transferat the bottom on the right.

You can now upload the *.WibuCmRaC file (Browse....) by clicking Upload license request now. This creates your license, which you can download by clicking Download license update file now. Install this license on your computer.

To do this, go to CodeMeter Control Center and click File-> Importlicense.


You can see the activated license in the Services application -> Utilities -> License settingsand you can now use this license for Allplan.


Finally, upload the receipt file.
To do this, open CodeMeter Control Centeragain and select the new Allplan GmbH license with the number 128-XXXXXXX.

Then click License update -> Next -> Create receipt.
Create the receipt file for this container.
Upload this receipt file using the web page.

Take this file to the computer that is online. Click Nexton the web page.
If you have already closed the web page, use the link given above and enter your Product Key once again. Then select Continue with license transfer.
Select the receipt file and click Upload receipt now.
Click OKto confirm. This completes license activation.




B: Returning licenses offline

You can return licenses in the same way:
Start CodeMeter Control Center and select the container with the license (Allplan GmbH with the number 128-XXXXXXX). Then click License update -> Next -> Create license request.
Here, too, create a *.WibuCmRaC file for your container.

Take this file to a computer that is online.
Here, too, go to the following web page:
http://lc.codemeter.com/59885/depot/index.php

Enter your Product Keyin the “Ticket” line and click Next. You can now see your license.
Click Move license.
Click Offline License Transferat the bottom on the right.
You can now upload the *.WibuCmRaC file (Browse....) by clicking Upload request now.
Then click Download license update file now. Download the file and import it. To do this, go to CodeMeter Control Centerand click File -> Importlicense.

Then create a receipt by clicking License update -> Next -> Create receipt.
Upload this receipt file using the web page.
To do this, click Nexton the web page.
If you have already closed the web page, use the link given above and enter your Product Key once again. Then select Continue with license transfer.
Select the receipt file and click Upload receipt now.
Click OKto confirm. This completes license activation.

The license is now available again and can be used on another computer.

Загрузка PDF  FAQ_EN_Activating_license_offline_(without_Internet_...
Версия:  Allplan 2019  | Последнее изменение: 12.11.2018
Not voted yet. Be the first to vote this FAQ as helpful!

Information:

This document provides further information on installing Allplan 2019.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2019.


How to install


You can find detailed instructions on how to install Allplan 2019 in the following places:

- After you have downloaded and unzipped Allplan 2019, you can find the ‘install.chm’ file in the following folder: C:\Users\Public\Documents\Allplan 2019\HelpFiles\English.

- Use the following link:
https://webdrive.allplan.com/s/4LrjrymoxESzC6p and open the General\Installation help\2019 folder.


Please read these instructions before you install Allplan 2019.

System requirements for Allplan 2019

https://connect.allplan.com/en/faqid/20180608093815.html

How to handle licenses when upgrading to Allplan 2019

https://connect.allplan.com/en/faqid/20180608092654.html



Some notes on installing Allplan 2019

If you want to switch from Allplan 2016/2017/2018 to Allplan 2019, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2016/2017/2018.

1. First-time installation

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). Setup does not transfer any data or settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2019 and then upgrade from Allplan 2016/2017/2018.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from version

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). You can configure Setup to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2016/2017/2018 to the new installations folder.
This duplicates the data: You can use all projects, defaults and resources both in Allplan 2018 and in Allplan 2016/2017/2016. This way, you can test the new version without losing your 'old' Allplan version.
Bear in mind, though, that you should not mix data from different versions. Merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already used the second installation option to install <Product_Version> to a computer that accesses the same data server. As a result, the data are already available.

3. Upgrade and transfer data from Allplan 2016/2017/2018

This option installs Allplan 2019 to an existing folder, converting Allplan 2016/2017/2018 to Allplan 2019 and transferring all important settings. Afterwards, you can no longer work with Allplan 2016/2017/2018.
This does nor affect earlier Allplan versions (Allplan 2015 or earlier).


Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2019. Beforeyou start installing, make sure that all workstations can be upgraded. For technical reasons, it is not possible to mix installations of different major releases. Any related problems area not covered by service contracts.
  • During the upgrade, Allplan 2016/2017/2018 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.





Converting the data:

Data from earlier Allplan versions need to be converted to version 2019. Allplan 2019 automatically converts the data of a project you open. Click here for instructions on how to convert all projects in a single operation:

https://connect.allplan.com/en/faqid/20090408124904.html


IBD 2019

Click here for instructions on how to get your activation codes for Allplan IBD:

https://connect.allplan.com/en/faqid/20110912113530.html

Загрузка PDF  FAQ_EN_Hotletter_2019.pdf
Версия:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018  | Последнее изменение: 12.11.2020
1 user(s) found this FAQ helpful

Question:

Why is Allplan running so slow?


Answer:

Check the following points:

1. Current version
Make sure you work with the current Allplan version.

  • Do the following or ask your system administrator to do this:
    Open Allplan and click the ‘?’ icon in the upper right-hand corner. Click ‘Update Allplan’.
    Select 'Find now'. If Allplan finds updates or hotfixes, download the installation packages.
  • Deactivate the virus scanner while your are installing updates or hotfixes. This might require administrator privileges. Contact your system administrator if you have problems.
  • Right-click the Allplan icon on the desktop. A shortcut menu opens.
    Select ‘Run as administrator’ and click ‘Yes’ to confirm the following message.
    As a result, Windows security settings do not block the installation.



2. System requirements:
Check the hardware and software required for your Allplan computer.

2.a)Download and run the system test.
Check the notes.
https://www.allplan.com/de/system/systemvoraussetzungen/

2.b)Check the Allplan system requirements:
https://www.allplan.com/de/system/systemvoraussetzungen/

2.c)You can find information about graphics cards at
https://connect.allplan.com/de/support/grafikkarten.html

2.d)You can find server operating systems you can use for the central file storage of Allplan at
https://connect.allplan.com/en/faqid/20140924094923.html


3. Hotline tools:
Start the Services application, open the ‘Service’ menu and select ‘Hotline Tools’. To save your settings, select the following tools.

- savestd: Saves user defaults.
- savereg: Saves CAD registry settings.

Start the Services application, open the ‘Service’ menu and select the following ‘Hotline Tools’:

- cleanup: Initializes the display.
- cleanstd: Resets CAD defaults.
- cleanreg: Resets CAD registry settings.

Check whether this has solved the problems.
If this is not so, restore the settings you just saved. To do this, start the Services application, open the ‘Service’ menu and select the following ‘Hotline Tools’:
- reststd: Restores saved user defaults.
- restreg: Restores CAD registry settings.


4. Color scheme selected in Allplan:
Start Allplan, open the ‘View’ menu, point to ‘Toolbars’ and select ‘Customize User Interface’. Open the ‘Customize’ tab and set ‘Color scheme and icon design’ to ‘Windows’.


5. Check the availability of all projects that are not online (if you use Workgroup Manager):
Start Allplan, open the ‘File’ menu and select ‘New Project, Open Project’. Deactivate ‘Check availability of all offline projects’.


6. Virus scanner
Check whether an anti-virus program is running in the background of the computer or server.
If so, reduce protection to "programs only".

Scanning "all files" can take a long time, considerably slowing down your computer when you switch between projects or exit the program.
You can exclude the Allplan installation folders from real-time scanning.When you start the Services application, you can see a list of the folders to be excluded.
You can find more information at
https://connect.allplan.com/en/faqid/20091126145752.html
Changes in the settings of the virus scanner only come into effect when you re-start the computer.


7. Aero desktop effects
Deactivate the Aero desktop effects of Windows.
To do this, open the Control Panel, select ‘Ease of Access’ and go to the ‘Make things on the screen easier to see’ area.
Select the ‘Turn off all unnecessary animations (when possible)’ option.


8. Name resolution on the network
If Allplan takes several minutes to start, name resolution on the network may not work.
To check this, do the following:
Right-click the Windows Start Button, select ‘Run’, type in ‘cmd’, click OK, type in ‘Nslookup’ and press ENTER.
Go to the line following the > character, type in the name of the Allplan data server and press ENTER.
The reply starts with the name and address of the server providing name resolution.
You can find the name and address of the Allplan data server in the second group.
If problems occur, contact your network administrator and ask him or her to configure name resolution correctly.


9. Speed of Allplan projects
Check whether some Allplan projects are slower than other Allplan projects.
Start with the empty project and check whether it is slow too.
After this, select any other Allplan project.

If it is only the current project that is slow, the problem may be caused by the data of the current project.
In this case, the data of this project must be analyzed in detail.
Contact technical support.


10. Network: checking out Allplan using Workgroup Manager
If you use Allplan with Workgroup Manager, you can check whether the problems are caused by the network. To do this, check out the workstation with the project in question and use the project on the local Allplan workstation.
You can find detailed information on checking out an Allplan workstation using Workgroup Manager in the
Services application. Open the ‘Help’ and select ‘Workgroup Manager’.

After you have checked out the workstation, Allplan no longer accesses the central file storage of the server.
If this has solved the problems, they are caused by the network. In this case, the network must be checked in detail.
Contact your network administrator and ask him or her to do this.

If the project is still slow, the problem may be caused by the data of the current project.
In this case, the data of this project must be analyzed in detail.
Contact technical support.


11. Log files and system information files
If all the points above do not solve the problems, technical support requires more system information about the computer running Allplan.

  • So, we would be grateful if you could send us a support request (Allplan Hotinfo with Allplan logging).
    To create a support request, start the Services application, open the ‘Service’ menu and select ‘Create support request (Hotinfo)’.
    Several dialog boxes open. Select ‘Technical Support Allplan’ and ‘Enquiry with Allplan logging’. Enter all the data required. Finally, click ‘Finish’.
    Another dialog box opens, prompting you to start Allplan. Click the ‘Start Allplan’ button.
    Allplan starts, logging all processes.
    Try to reproduce the problem as exactly as possible.
    Exit Allplan as soon as possible, reducing the data in the log file to a minimum.
    Then click ‘Next’ to generate the support request with the log file.
    You can find more information about Hotinfo at
    https://connect.allplan.com/en/faqid/20140528094911.html
  • To analyze the Windows system environment, we would ask you to send us the logs created by Windows Event Viewer of your computer.
    To start Windows Event Viewer, right-click the Windows Start Button, select ‘Run’ and type in ‘eventvwr.msc’.
    You can also type in ‘Event Viewer’ in the search box of Windows. This displays the link file to the Windows event logs.
    Using Event Viewer, create *.evtx files for the application log and the system log in the ‘Windows Logs’ area and for the ‘Administrative Events’ log in the ‘Custom Views’ area.


Please send us the files.

Загрузка PDF  FAQ_EN_Allplan_is_running_slow.pdf
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015  | Последнее изменение: 25.11.2019
4 user(s) found this FAQ helpful

Note:

You can help the technical support team to process your request by generating a support request with the Hotinfo program and sending it to us.

The generated support request will help to avoid unnecessary questions and delays, as it automatically contains all necessary information pertinent to the problem in question.


Procedure:

The Hotinfo program is installed along with Allplan; you can start it over the following ways:
1. Start -> All Programs -> Nemetschek -> Allplan [version number] -> Hotinfo [version number].
2. Allplan -> ? -> Generate support request (Hotinfo)
3. Allmenu/Services -> Service -> Create Support request (Hotinfo)


Select the team with whom you wish to communicate:
Choose the relevant entry, for example, Technical Support Allplan. The email address of the selected team is entered automatically.

Select the areas on which you have questions:
Please select the question that is pertinent to your support request.
You only need to select question 2 when Allplan support is requesting it from you.

01. General inquiry
02. Inquiry with Allplan logging

Note on question 02:
If you have selected question "02. Inquiry with Allplan logging", you can start Allplan straight form the Hotinfo after the questions.
This will generate and attach a log (trace).
Start Allplan by clicking on the button “Start Allplan”
Carefully reproduce the problem – for example, perform the steps that lead to the failure.
Then click "Next" to generate the support request with the trace.
You can click the "Take screenshot" button at any time while Allplan is running in logging mode. This way, you can quickly and easily save any error messages that may be displayed.

Enter your contact address:
Please enter your name, telephone number and email address
so that the technical support team can contact you.

Please describe the problem:
Describe the problem in detail (for example, include the exact wording of error messages).

Select the files you want to attach to the email:
You can include additional files with important information such as damaged drawing files, NID files or other files.

Note:
These files are only attached to the email when you send the Hotinfo by clicking “Finish” -> Option “Start email program…" or send it to us over File -> Send Message...".
See note further down.

Create the screenshots you want to attach to the email:
You can use the "New screenshot" button to take screenshots of the entire screen and send them as a file attachment to the Hotinfo.

Note:
These files are only attached to the email when you send the Hotinfo by clicking “Finish” -> Option “Start email program…" or send it to us over File -> Send Message...".
See note further down

Finish
Here you have the possibility over the pre-selected option "Start Email program..." to start your email program with the created Hotinfo, the generated files as a file attachment and the correct destination address. You only need to press &apos;Send&apos;.

Over option "Open Hotinfo file to save it..."you can open the support request, save, and send as an email attachment to support.de (please no spam) @ (please no spam) allplan.com, if no e-mail program is installed locally.
In this case, make sure to attach in addition to the support request all additional files also. Attach the "attached files" and "generated screenshots" independently as attachment to your email.

Загрузка PDF  FAQ_EN_Generating_a_support_request_using_Hotinfo.pd...
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013  | Последнее изменение: 31.08.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I fix Allplan program data?


Answer:

You can fix Allplan program data by renaming the program folders and installing an update.
Due to the new names, Allplan cannot find the resources during the update. Consequently, it creates new resources.

To fix Allplan program data, do the following:

You need the latest installation package for your version.
You can download this package from Allplan Connect (www.connect.allplan.com) or from our FTP server.

Accessing the FTP server:
Enter the following address in Windows Explorer (do not use Internet Explorer!):
ftp://nemhotline:ha37jvg8f@ftp.nemetschek.de

You can find the installation packages in the following path:
/download/Allplan/"version"/CD/
Copy the zip file to the local computer and unzip the file.

  • Open the Services application of the Allplan version you want to fix.
  • Select Service -> Windows Explorer -> CAD program folder.
  • Rename the "PRG" folder "PRG_OLD". If Windows Explorer tells you that a file is still in use, restart the computer and try again.
  • Start the *.exe file of the installation package you just unzipped.
  • Select "Update installation".
  • When Setup prompts you for the license, select "Current license file" or "Use active license".
  • Select "Minimum" for the Setup type.



Allplan gets new program resources during installation.
As soon as the installation is complete, you can test how Allplan behaves.


Note:

If you are not sure, give these instructions to your system administrator.
Keep in mind that you install the version of the installation package you downloaded. This means that you may have to reinstall any subsequent hotfixes.

Загрузка PDF  FAQ_EN_Fixing_Allplan.pdf
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2017 / Allplan 2016 / Allplan 2015  | Последнее изменение: 12.06.2020
1 user(s) found this FAQ helpful

Question:

What can I do if Allplan no longer starts after I have upgraded and the following messages appear?
Allplan
Stop

...

After this, Quality Reporter displays an error report.



Answer:

Exit Allplan on all workstations and do the following:
Open the Services application and make a note of the path to the &apos;central file storage folder&apos;, which is displayed in the Services application window.
In addition, check whether the workgroup manager line is followed by &apos;Yes&apos; or &apos;No&apos;.

Open the central file storage folder in Windows Explorer.

If the workgroup manager line is followed by
&apos;Yes&apos;, open the NET subfolder.
&apos;No&apos;, open the PRJ subfolder.

Find the &apos;project.dat&apos; or &apos;project.Dat.xm&apos; file in the NET or PRJ folder and rename it &apos;project-old.dat&apos;.

After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> OK -> Restore project management file -> OK
The program creates a new, correct project management file and you can start Allplan again.



Note:

If you come across error messages while doing this, please email the following information to support@allplan.com:

  1. Describe exactly what you did before the error or crash occurred.
  2. The error message itself (as a screenshot).
  3. The log file (trace).
    https://connect.allplan.com/en/faqid/0001a27a.html
  4. A Hotinfo support request with question 01.
    https://connect.allplan.com/en/faqid/20130823123806.html
Загрузка PDF  FAQ_EN_Allplan_does_not_start_after_upgrade_Stop_mes...
Версия:  Allplan 2021  | Последнее изменение: 06.10.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Information:

This document provides additional information on installing Allplan 2021.

Data backup/archiving:

We strongly recommend that you perform a complete data backup and archive this data before you upgrade to Allplan 2021!


Installation Instructions:


Detailed installation instructions can be found in the following places:

- If you have downloaded and unpacked Allplan 2021, you will find the file install.chm in the folder C:\Users\Public\Documents\Allplan 2021\HelpFiles\English


Please read these before installing Allplan 2021.

System requirements Allplan 2021

https://connect.allplan.com/de/faqid/20200930085615.html

Licenses when upgrading to Allplan 2021

https://connect.allplan.com/en/faqid/20200821110044.html


Extract from the installation instructions (see above)

If you want to switch from Allplan 2018/2019/2020 to Allplan 2021, you have three basic installation options.

1. New installation

Allplan 2021 is installed in a new folder. Any existing installations of Allplan (2020 or older) are not affected. No data and settings are transferred to the new installation.

The following options are available for transferring data later:

Uninstall Allplan 2021 and then upgrade Allplan 2018/2019/2020.
Integrating the data by hand (administrator knowledge required).

2. New installation with data copy from version

Allplan 2021 is installed in a new folder. Any existing installations of Allplan (2020 or older) are not affected. The office standard (\std), projects (\prj) and user data (\usr) can be automatically copied from an existing version 2018/2019/2020 to the new installation folder.
In this way, you can create a duplicate dataset if necessary: all projects, standards and resources can be used in both Allplan 2021 and 2018/2019/2020. This allows you to test the transition to the new version in real life, while the existing Allplan installation remains fully functional.
Note, however, that this method of working should avoid parallel processing of data in both installations, as the subsequent merging is time-consuming.

2a. Continuation of new installation with data copy from version

This option is available if a new installation with data copy has already been performed on another computer accessing the same data server and therefore the data has already been transferred.

3. Upgrade with data transfer from version 2018/2019/2020

Allplan 2021 is installed in an existing folder. The existing installation of Allplan 2018/2019/2020 is converted to Allplan 2021 and all important settings are transferred (see also Limitations for Data Transfer). Allplan 2018/2019/2020 is then no longer available.
Any existing installations older than Allplan 2018 are not affected.


Network Installations:

For network installations (shared 'central file storage folder'), only one main release version can be used - all workstations must be brought to Allplan 2021. Before starting the installation, make sure that all workstations have upgrade authorization. A mixed installation of different main versions is not technically approved. Complications that may arise are not covered by the maintenance contracts.

During the upgrade, no workstation may be running any version 2020, 2019 or 2018.

In case of an installation with Workgroupmanager all workstations must be checked in during the upgrade.




Data Conversion:

Data from older Allplan versions must be converted to version 2021. This happens automatically for projects opened in Allplan 2021. For instructions on how to convert all projects at once, click here:

https://connect.allplan.com/de/faqid/20090408124904.html

Загрузка PDF  FAQ_EN_Hotletter_2021.pdf
Версия:  Allplan 2019 / Allplan 2018  | Последнее изменение: 05.05.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I set up Allplan Share? What are the requirements?


Answer:

1)System requirementsfor Allplan Share

Software required

Allplan Version 2018 or higher

Network infrastructure required

Minimum requirements:

A 20-Mbit/s Internet connection for downloading and uploading data

Recommended setup:

At least a 50-Mbit/s Internet connection for downloading and uploading data

2) Licensing

You have two options to buy the Allplan Share option.

1. You can visit the Allplan Shop at ‘shop.allplan.com’.

Allplan Options -> Allplan Share

a. Specify how many licenses you want to buy and add the Allplan Share option to the cart.

b. Follow the instructions displayed and buy the Allplan Share option.

After you have bought the Allplan Share option, the licenses will be assigned to your Bimplus team. You can manage these licenses using ‘My Account’ - ‘Subscriptions and Users’.

2. You can contact the Allplan sales partner in your area.

3) Assigning licenses

Regardless of how you buy the Allplan Share option, you can manage the Allplan Share licenses in the Allplan Shop. Go to the ‘Subscriptions and Users’ area. As an alternative, you can also manage the licenses on the Bimplus portal. Here, go to the ‘Team members’ area.

Allplan Shop - ‘Subscriptions and Users’

1. Log in to the Allplan Shop and open ‘My Account’.

2. Click ‘Subscriptions and Users’ to see your licenses.

3. Select the Allplan Share option on the tab.

4. You can assign one or more Allplan Share licenses to team members. To do this, select the user in the list and assign the license by selecting the check box. You can remove the license at any time by clearing the check box.

If the list does not include the user to whom you want to assign a license, click ‘Invite new Bimplus team member’, enter the email address of the new team member and select a role.

As soon as the new team member has accepted the invitation, you can find this person in the list.

4) Using Allplan Share

To use the Allplan Share option, you require Allplan 2018. The Workgroup Manager option is not necessary.

Starting a project

You have three options to start an Allplan Share project:

1. You can create a new project and save it on Bimplus by setting the location to BIMPLUS. To create a Bimplus project with Allplan Share content, you require ‘Bimplus team owner’ or ‘Bimplus team admin’ privileges.

2. You can copy an existing Allplan project to Bimplus by selecting ‘Copy to’. You can then share this project with other project partners. This does not affect the source project.

3. You can move an existing Allplan project to Bimplus by selecting ‘Move to’. This moves the source project to Bimplus. As a result, this project is no longer available on the local computer or local network.

5) Managing users and assigning users to the project

Allplan Share is a cloud-based solution. Therefore, Allplan Share uses the Bimplus user management for project collaboration. As a result, Allplan Share is independent of local user management systems like Workgroup Manager.

After you have copied or moved an existing Allplan project to Bimplus, you must reassign the users to this project. Otherwise, they cannot access this project.

To define the project members, use the Bimplus project administration. In addition, you must invite new project members to the Bimplus project.

If these Bimplus project members are to use the Allplan Share option too, you must assign an Allplan Share license to each member in advance (as described in ‘3) Assigning licenses’).